Abstract

ISO/IEC 27001 makes information security risk assessment and treatment the engine of an information security management system, then leaves the method to the organization. How should that method be built? ISO/IEC 27005:2022, the fourth edition of the family’s risk guidance, gives a process rather than an answer: it adapts ISO 31000 to information security, follows the clause layout of 27001:2022, defines risk scenarios explicitly, and contrasts an event-based approach, which starts from risk sources and the objectives at stake, with an asset-based approach, which starts from assets, threats and vulnerabilities. The workable sequence it supports is: numeric criteria and acceptance rules first; scenarios identified from one or both starting points; levels from an approved lookup with quantified ranges where a band hides too much; treatment chosen against the criteria and checked against Annex A; then a plan the risk owner approves and a residual the owner accepts, with current exposure, in our proposed implementation, decided separately until the plan is done. The limits are real: the standard is silent on the arithmetic of risk levels, and qualitative matrices compress and can misrank risks.

What ISO/IEC 27005 is, and what it is not

ISO/IEC 27005:2022 (opens in a new tab), Information security, cybersecurity and privacy protection: Guidance on managing information security risks, is a 62-page International Standard from ISO/IEC JTC 1/SC 27, published on 25 October 2022 as the fourth edition.1 Its scope gives guidance to help organizations “fulfil the requirements of ISO/IEC 27001 concerning actions to address information security risks” and to perform risk management activities, “specifically information security risk assessment and treatment”, and it applies to all organizations “regardless of type, size or sector”.2 ISO’s catalogue entry says it “adapts the general principles of ISO 31000 to the specific context of information security” and covers “assessment, treatment, communication, monitoring and review”.1

Three things follow from that scope.

  • It is guidance. ISO/IEC 27005 provides risk management guidance in support of the ISMS requirements in ISO/IEC 27001.1 PECB offers personnel certifications in ISO/IEC 27005.3 Organizations are certified to ISO/IEC 27001:2022 (opens in a new tab), whose clause 6.1.2 requires a defined risk assessment process with risk criteria, consistent, valid and comparable results, identified risks and risk owners, analysis, evaluation and prioritization, and retained documented information, and whose 6.1.3 requires a defined treatment process, without naming a method.4 An SC 27 journal article by a WG 1 expert states that 27005 and its neighbours “are not intended to be used as conformity assessment standards”, and that an auditor “should not promote or require a specific approach”.5 A method built on 27005, NIST SP 800-30, FAIR, EBIOS Risk Manager or the organization’s own design can serve, provided the process as defined and applied meets every element of 6.1.2 and 6.1.3. Naming a method does not do that by itself.
  • It sits under ISO 31000. ISO 31000:2018 (opens in a new tab), Risk management: Guidelines, is the generic risk standard, 16 pages long, and ISO says it “is not a certifiable risk management standard”.6 27001 notes that its risk assessment and treatment process aligns with the principles and generic guidelines of ISO 31000.4 Most of 27005’s definitions are taken from ISO 31000:2018 or ISO Guide 73:2009, some with information security notes added.2
  • Its only normative reference is ISO/IEC 27000, undated. Under the standard wording for undated references, the latest edition applies.2 Since 3 July 2026 that is the sixth edition, ISO/IEC 27000:2026.7 The hub article on the ISO/IEC 27000 family describes that edition and where 27005 sits among its siblings.

The introduction says 27005 “supplements the guidance in ISO/IEC 27003”, the clause-by-clause guidance on 27001.2 The clause article, Inside ISO/IEC 27001:2022, clause by clause, already covers the text of 6.1.2 and 6.1.3 and walks one risk register line into an SoA line.

Four editions

EditionPublishedPagesNotes from public sources
ISO/IEC 27005:20084 June 200855“provides guidelines for information security risk management”; supports the concepts of ISO/IEC 27001
ISO/IEC 27005:201119 May 201168Same scope statement as 2008
ISO/IEC 27005:20189 July 201856Technically revised: direct references to 27001:2005 removed; states that it “does not contain direct guidance on the implementation of the ISMS requirements”; Annex G removed; editorial changes
ISO/IEC 27005:202225 October 202262Realigned with 27001:2022 and ISO 31000:2018; risk scenario concepts; event-based versus asset-based identification; one annex

Dates, page counts and the 2008 to 2018 scope statements are from ISO’s open data; the 2018 changes are from the 2018 foreword in a distributor’s redline preview.78

The 2018 contents show twelve numbered clauses, from scope to “Information security risk monitoring and review” in clause 12, with risk treatment in clause 9 under four subclauses named risk modification, risk retention, risk avoidance and risk sharing. Its six informative annexes, A to F, cover scope and boundaries, identification and valuation of assets and impact assessment, examples of typical threats, vulnerabilities and methods for assessing them, risk assessment approaches, and constraints for risk modification.8 Three of the six are built around assets, threats and vulnerabilities, which gives the 2018 edition a visible asset-based emphasis.

What changed in 2022

The 2022 foreword lists six main changes: all guidance text aligned with ISO/IEC 27001:2022 and ISO 31000:2018; terminology aligned with ISO 31000:2018; the clause structure adjusted to the layout of 27001:2022; “risk scenario concepts have been introduced”; “the event-based approach is contrasted with the asset-based approach to risk identification”; and the annexes “revised and restructured into a single annex”.2 Scenario-based assessment was not new in 2022; what the edition adds is an explicit definition of the concept and its place in the method. The single annex is informative and titled Examples of techniques in support of the risk assessment process.2 The 2022 contents run from clause 1 to clause 10, against clauses 1 to 12 in 2018; Drata, a compliance software vendor, gives the same count of 10 clauses and one annex against 12 clauses and six annexes.289

Is a revision under way?

The 2022 edition remains the current one. ISO’s catalogue entry shows it at stage 60.60, published, with no systematic review stages dated.1 ISO’s open data, however, lists record 94941 as the successor to 80585, and the Institute for Standardization of Serbia, an ISO member body, shows 94941 as ISO/IEC PWI 27005 at stage 00.00, effective 9 July 2026, owned by ISO/IEC JTC 1/SC 27.710 A preliminary work item is a proposal held in the committee’s work programme. It is neither an approved revision project nor a systematic review, and it fixes no timetable.

The parent standard is also moving. ISO 31000:2018 has been at stage 90.92, to be revised, since 11 October 2024, and an ISO/DIS 31000 for a third edition is registered at stage 40.00.67

The vocabulary that carries the method

27005:2022 defines 27 terms in two groups in Clause 3, and several carry design decisions.2

  • Risk (3.1.3) is “effect of uncertainty on objectives”, as in ISO 31000. Its notes add that information security risks can be expressed as effect of uncertainty on information security objectives, are usually associated with negative effects, and can be associated with threats exploiting vulnerabilities of information assets.
  • Risk scenario (3.1.4) is defined explicitly for the first time in this edition, taken from ISO 17666:2016 on space systems risk management: a sequence or combination of events leading from an initial cause to an unwanted consequence. A scenario is the unit that gets a likelihood and a consequence.
  • Risk source (3.1.6) is an element with “the potential to give rise to risk”. An added note gives three types, human, environmental and technical, and another says a human source can be intentional or unintentional.
  • Risk owner (3.1.5) is the “person or entity with the accountability and authority to manage a risk”. Whether the owner’s authority is sufficient, for instance over the budget or systems involved, is an implementation question the definition leaves to the organization.
  • Control (3.1.16) is a “measure that maintains and/or modifies risk”, with the ISO 31000 note that controls “may not always exert the intended or assumed modifying effect”. Every residual rating depends on that assumption.
  • Residual risk (3.1.17) is risk remaining after treatment, and “can contain unidentified risk”.
  • Risk retention (3.2.10) is defined as “temporary acceptance” of the gain or loss from a risk, “temporary” being 27005’s addition to the Guide 73 definition, with a note that retention “can be restricted to a certain period of time”. Risk acceptance (3.2.8) is an “informed decision to take a particular risk”, and its note says accepted risks are subject to monitoring and review.
  • Risk communication and consultation (3.2.2) describes consultation as “a process which impacts on a decision through influence rather than power” and “an input to decision making, not joint decision making”. That fits 27001’s allocation of approval and acceptance to risk owners.

The process, and how it maps onto ISO/IEC 27001

The shape of the process

Clause 5 presents the process as a figure “based on the general risk management process defined in ISO 31000”: context establishment, then risk assessment (identification, analysis, evaluation), then treatment, with communication and consultation and monitoring and review alongside.11 Two features distinguish it from a single pass.

First, it is iterative with two explicit decision points. After assessment, if the information is not sufficient to determine the actions that would bring risks to an acceptable level, another iteration of assessment follows, possibly with a revised scope or more expertise (“risk decision point 1”). After treatment, if residual risk is still not acceptable, the organization tries further treatment or goes back to assessment (“risk decision point 2”).11 That allows a coarse first pass followed by targeted depth.

Second, clause 5.2 splits updating into two cycles. In the strategic cycle, business assets, risk sources and threats, target objectives or consequences change with “the overall context of the organization”, which can trigger an overall update or new assessments. In the operational cycle, those elements feed individual assessments, whose scenarios are reviewed and updated along with the corresponding treatment. The strategic cycle “should be conducted at longer time basis or when major changes occur”, the operational cycle more often.11

Input, action, trigger, output

Clause 4 says that, apart from general subclauses, the activities from clause 7 to clause 10 are each described in a fixed pattern: Input, Action, Trigger (when to start, for example on a change in the organization or the external context, or according to a plan), Output, and Guidance.11 The pattern is a documentation aid. A method document written in the same fields records, for each step, what goes in, what is done, what starts it, who runs it and what record comes out. In the worked example below, a new critical supplier triggers an operational assessment run by the supplier’s business owner with the security team, and the output is a register entry with ratings, owner and assumptions.

Process and operation are separated

27005 separates defining the process from running it, as 27001 does. Clauses 7 and 8 describe the assessment and treatment processes; clause 9, Operation, has Performing information security risk assessment process and Performing information security risk treatment process.2 In 27001, 6.1.2 and 6.1.3 require the processes to be defined, and 8.2 and 8.3 in clause 8, Operation, are titled Information security risk assessment and Information security risk treatment.12 An SC 27 journal article quotes 8.2 as requiring the organization to “perform information security risk assessments at planned intervals or when significant changes are proposed or occur, taking account of the criteria established in 6.1.2 a)”.13 An auditor can test whether reassessments happened on schedule and when significant changes were proposed or occurred, whether the organization used the defined criteria, whether it implemented the treatment plan, and whether it retained the results of assessment and treatment.14 An organization can be nonconforming in either place: a sound method that is not run, or a run that does not follow the method.

The map

Several 2022 subclauses carry a note naming the 27001 clause they relate to. The distributor’s expanded preview of the published edition shows four: 6.1 relates to 27001 4.1, 6.2 to 4.2, 6.3 to 4.3, and 6.4.2 to 6.1.2 a) 1).15 Other subclauses also carry cross-reference notes. Read by subject, 27005 covers assessment and treatment in Clauses 7 and 8, corresponding to 27001 6.1.2 and 6.1.3. Its Clause 9 covers the operation of those processes, corresponding to 27001 8.2 and 8.3. Its Clause 10 covers related ISMS processes across 27001 Clauses 4, 5, 7, 9 and 10. Those heading matches pair 27005’s corrective action (10.7) with 27001’s nonconformity and corrective action (10.2), and 27005’s continual improvement (10.8) with 27001’s continual improvement (10.1).2124

Context and risk criteria

27001 6.1.2 a) requires risk criteria that include “the risk acceptance criteria” and “criteria for performing information security risk assessments”, and 6.1.2 b) requires that repeated assessments “produce consistent, valid and comparable results”.4 27005 splits the two kinds of criteria into 6.4.2 and 6.4.3.2 Acceptance criteria say which risks may be retained and by whom; criteria for performing say how an assessment is done.

The expanded preview of 6.4.2 shows two provisions that matter for treatment later. Acceptance criteria should identify “the level of management with delegated authority to make risk acceptance decisions”, and they “can be absolute or conditional depending on the context”. One listed consideration is that “a risk can be retained on a short-term basis even when the level of risk exceeds the risk acceptance criteria”, subject, in the rest of that item, to approval and a commitment to implement chosen controls that reach an acceptable level within a defined period.15

The SC 27 journal article lists what a documented process usually contains: a likelihood scale and an impact scale (“a scale of 1 to 3 or 1 to 5”); clear rules for applying them and determining the level; a definition of risk appetite that can be applied directly to a risk’s attributes, which the author says a general statement of low appetite does not achieve; rules for acceptance; rules for prioritizing treatment; and rules for when the assessment is updated, “usually when something has an effect within the scope, or at regular intervals, for example, annually”.5 Such a method can satisfy 6.1.2 a) and b) on paper while its results are not valid, a question taken up below under scales.

Clause 6.5 is titled Choosing an appropriate method; its body is not in the public previews.215 Recording in the method document whether event-based identification, asset-based identification or both are used, and which techniques, is our recommendation. The SC 27 journal lists techniques an organization might use: “questionnaires, brainstorming, checklists, structured what if, business impact analysis, root cause analysis, failure mode effect analysis, vulnerability assessment, penetration testing or threat modelling”.5

Identification and risk owners

27001 requires identifying risks “associated with the loss of confidentiality, integrity and availability for information within the scope”, and identifying the risk owners.4 27005 handles both in 7.2.2 The journal article’s audit questions include “Who was involved in the identification of risks? (This should be more than the information security team)” and “Do all the risks have a risk owner with enough accountability and authority to manage the risk?”5

Analysis and evaluation

Analysis in 27001 has three parts: assess the potential consequences, assess “the realistic likelihood” of occurrence, and determine the levels of risk.4 27005’s 7.3.2 to 7.3.4 follow the same order.2 The definitions allow either qualitative or quantitative expression: likelihood can be “defined, measured or determined objectively or subjectively, qualitatively or quantitatively”, including “a probability or a frequency over a given time period”, and consequences “can be expressed qualitatively or quantitatively”.2 Nothing in 27005’s public text requires a matrix, and a loss distribution fits the definitions as well as a five-point scale.

Event-based and asset-based identification

What each approach looks for

The 2022 foreword says that the event-based approach “is contrasted with” the asset-based approach.2 The detailed text is not in the public previews, so the description below rests on summaries, labelled.

PECB, a training and personnel certification body, describes the event-based approach as “a high-level assessment that involves identifying strategic scenarios”, and the asset-based approach as “an in-depth assessment that can be used to build operational scenarios” by identifying assets, threats and vulnerabilities in detail.3 PECB lists the annex sub-clauses as A.2.4 for the event-based approach and A.2.5 for the asset-based approach.3 Drata’s summary adds that the asset-based approach considers primary and supporting assets and the dependencies between them, and that “[o]rganizations can use both approaches to describe the same risk scenario from different perspectives”.9 Both summaries use the vocabulary of the public preview: risk sources, risk scenarios, and the strategic and operational cycles of clause 5.2.211 The SC 27 journal names the pair, from an auditor’s side, as “Asset-vulnerability-threat and event-consequence”.5

Event-basedAsset-based
Starting pointRisk sources of any type, and the organizational objectives they put at risk; for intentional human sources, also what the source is trying to achieveAn inventory of primary assets (information, business processes) and the supporting assets they depend on
Unit of analysisStrategic scenario: risk source, the objectives and interested parties affected, the business consequenceOperational scenario: a threat exploiting a vulnerability of a specific asset
Typical outputA shorter list of business-level scenarios with owners and consequencesA longer list of technically specific scenarios that can be tied to particular controls
StrengthCan capture risks that no single asset shows, such as fraud, extortion, supplier failure, regulatory exposure and shared dependenciesTraceable to systems; supports specific control choices; uses the asset inventory (27002 5.9)
WeaknessCan stay abstract unless followed by a detailed passCan produce long lists, and can miss business-level and cross-asset scenarios unless dependencies are modelled
Fits wellFirst assessments, executive review, new markets or products, the strategic cycleDetailed design, changes to specific systems, the operational cycle

The table is our synthesis from the sources above and from the 27002 title for control 5.9, Inventory of information and other associated assets.16 A non-adversarial scenario such as a regional cloud outage has no attacker objective; its event-based description starts from the source and the business objective affected, here availability of the service.

How they combine

Drata’s example shows two views of one scenario; it does not fix an order.9 One workflow consistent with 27005’s iteration is top-down then targeted: an event-based pass identifies strategic scenarios with business consequences and owners, and for those that are unacceptable or poorly understood an asset-based pass traces paths through specific supporting assets as operational scenarios.11 Asset-first with event-based review is equally possible. Paths are worth assessing separately where their controls differ, as in the worked example; what the register should avoid is counting the same end event twice when risks are summed or compared at portfolio level.

NIST SP 800-30 Rev. 1 offers three starting orientations, threat-oriented, asset/impact-oriented and vulnerability-oriented, notes that “[d]ifferences in the starting point of the risk assessment can potentially bias the results, causing some risks not to be identified”, and suggests identifying risks “from a second orientation” to improve rigour.17 It also says that threat-vulnerability pairing, a one-to-one listing of threats against vulnerabilities, “may be undesirable when assessing likelihood at the mission/business function level” and can be problematic even at system level because of the numbers involved.17

EBIOS Risk Manager

The terms risk source, target objective, strategic scenario and operational scenario also structure EBIOS Risk Manager, the method published by ANSSI, the French national cybersecurity agency. A 2021 note by the French Gendarmerie officers’ school research centre, written by an ANSSI inspector, describes EBIOS RM as five workshops, including “Risk Origins”, “Strategic Scenarios” and “Operational Scenarios”, in which strategic scenarios are refined into operational ones and given a likelihood, and says the method evolved “taking into account” the ISO 27005 standard.18 The same note says the risk sources considered in its scenario workshops “are exclusively human and malicious”, other sources being assumed to be covered by the security baseline set in the first workshop; 27005’s risk sources also include environmental and technical ones.182 ORSYS, a French training company, reports that ANSSI updated the method in March 2024 as version 1.5 and that “[t]he main aim of these changes is to make the method fully compliant with the ISO/CEI 27005:2022 standard”.19 That is a claim by the method’s publisher, as reported by ORSYS, not an independent assessment. EBIOS RM is thus a specific top-down method for intentional, targeted threats, resting on a baseline for the rest.

Scales, levels and the trouble with heat maps

What 27005 leaves open

27005 defines the level of risk (3.1.15) as the significance of a risk, expressed as a combination of consequences and their likelihood, and leaves the combination to the method.2 SP 800-30 is equally reticent: as the companion article on risk economics notes, it supplies exemplary five-level scales and lookup tables but “does not specify algorithms for combining semi-quantitative values”.17 That article covers the quantitative alternatives (annual loss exposure, FAIR, Gordon and Loeb) and Cox’s limitations of risk matrices in detail. The points below bear on writing 27005 risk criteria.

Ordinal arithmetic

One method, for example, multiplies a 1-to-5 likelihood by a 1-to-5 consequence and calls the product the level. The codes are ranks; multiplying them treats a 4 as twice a 2, which the scale does not say. Take the scales in the worked example, where likelihood band 2 is 0.02 to under 0.1 events a year, band 4 is 0.5 to under 2, consequence band 2 is EUR 10,000 to under 100,000 and band 4 is EUR 1 million to under 10 million. Scenarios rated L2 × C4 and L4 × C2 both multiply to 8. A plug-in estimate that takes the geometric midpoint of each band, a convention that is neither the mean frequency nor the mean loss, gives about EUR 141,000 a year for the first and about EUR 32,000 for the second. Products of the band edges run from EUR 20,000 to EUR 1 million for the first and EUR 5,000 to EUR 200,000 for the second. Band edges alone give neither an expected loss nor its uncertainty; for that, the frequency and severity distributions have to be estimated. The illustration shows only that the same product can hide materially different exposures.

Within a qualitative method, the alternative is a lookup table approved cell by cell, with each band defined by a numeric range. A matrix used that way is still a useful triage and policy tool: it sorts a long list, routes decisions to the right authority, and flags what needs closer analysis. What it loses is resolution within a cell.

Range compression and resolution

Cox’s 2008 analysis in Risk Analysis found that typical risk matrices “can correctly and unambiguously compare only a small fraction (e.g., less than 10%) of randomly selected pairs of hazards” and “can assign identical ratings to quantitatively very different risks”.20 In a register, that appears as one top cell holding several risks whose estimated losses differ widely, so prioritization under 27001 6.1.2 e) 2) has to rest on a further rule or on recorded judgement.

A simple sensitivity check makes this visible: move each rating up and down one band and note whether the level or the rank changes. If plausible uncertainty about a frequency or a consequence moves a scenario across an acceptance threshold, the decision depends on that uncertainty, and the scenario is a candidate for a quantified range.

Correlation

Cox also showed that for risks “with negatively correlated frequencies and severities”, matrices can be “worse than useless”.20 The result is mathematical; the paper does not measure how often the pattern occurs in security registers.

Aggregation and common causes

A register of separate scenarios can hide shared causes. If many scenarios depend on one identity provider, cloud account structure or managed service provider, that dependency motivates a joint scenario of its own. Its rating is not the sum or maximum of the others: it needs an estimate of how often the shared component fails, which dependent scenarios would materialize together, the joint and cascading impact, and how much of that impact is already counted in the individual scenarios. SP 800-30 makes the same point. For discrete risks the worst-case impact sets an upper bound on overall risk, but “this upper bound for risk may fail to apply” when “multiple risks materialize concurrently or when the same risk materializes repeatedly”, and risks can be “coupled (in a qualitative sense) or correlated (in a quantitative sense)”.17 27005’s strategic cycle is a natural place to look for such dependencies.11

Words for likelihood

Budescu, Broomell and Por asked subjects to assign numbers to the probability terms in the 2007 IPCC report and found that their judgements “deviated significantly from the IPCC guidelines, even when the respondents had access to these guidelines”.21 The study concerns climate reports; applying it to security risk scales is our inference. It suggests that a likelihood scale defined only in words risks inconsistent ratings between assessors. Numeric anchors, and two assessors rating independently before discussion, are ways to test whether a method produces the repeatable results 6.1.2 b) requires.4

Criteria: a proposed policy

The following is our proposed policy for 27005 criteria, not a requirement of either standard.

  1. Define each likelihood band as an expected number of occurrences of a stated end event over a stated period, and say whether the scale means that or the probability of at least one occurrence, since the two differ when events are frequent or cluster.
  2. Define each consequence band by numeric anchors (money, records, hours of outage, regulatory outcome), with each boundary assigned to exactly one band.
  3. Combine by an approved lookup table, not by multiplying codes.
  4. Record the band edges and assumptions behind each rating, including which controls are assumed to work.
  5. Run the one-band sensitivity check, and estimate a quantitative range for scenarios with a top-band consequence, ties at the top, or ratings that cross an acceptance threshold under it. The risk economics article describes how.
  6. At each strategic cycle, look for shared dependencies and assess them as joint scenarios.

The definitions already allow quantitative likelihood and consequence, and the iterative process already allows depth where it is needed.211

Treatment

The options

27001 6.1.3 a) requires selecting “appropriate information security risk treatment options, taking account of the risk assessment results”, without naming them.4 The 2018 edition of 27005 set out four options as subclauses: risk modification, risk retention, risk avoidance and risk sharing.8 The 2022 clause 8.2 is titled Selecting appropriate information security risk treatment options; the cited contents preview omits its body, so whether it keeps the four headings is not confirmed here.2 The 2022 definition of risk treatment (3.2.7) has a note listing what treatment can involve: avoiding the risk by not starting or not continuing the activity; taking or increasing risk to pursue an opportunity; removing the risk source; changing the likelihood; changing the consequences; sharing the risk, “including contracts and risk financing”; and “retaining the risk by informed decision”.2

That note was added by 27005 to the Guide 73 definition, and a second note excludes one item: information security risk treatment does not include taking or increasing risk in order to pursue an opportunity, although the organization can use that option in general risk management.2 ISO 31000:2018 sets out its options in subclause 6.5.2, Selection of risk treatment options; the cited sample shows only that title.22

The table below is our synthesis of the 2018 headings and the 2022 definition note, set against SP 800-30’s list of response types.

Common name (2018 heading)2022 definition noteNIST SP 800-30 response
ModifyRemoving the risk source; changing the likelihood; changing the consequencesMitigation
RetainRetaining the risk by informed decisionAcceptance
AvoidNot starting or not continuing the activityAvoidance
ShareSharing with other parties, including contracts and risk financingSharing or transfer
(none)Taking or increasing risk for an opportunity, excluded for information security riskNot listed

SP 800-30 lists response types as “risk acceptance, avoidance, mitigation, sharing, or transfer”.17 27005’s definition of risk sharing (3.2.9) adds that legal or regulatory requirements “can limit, prohibit or mandate” it, that its extent “can depend on the reliability and clarity of the sharing arrangements”, and that risk transfer is a form of risk sharing.2 Insurance can share financial consequences; it does not share a regulator’s view of who was responsible.

Determining controls, then comparing with Annex A

27001 6.1.3 b) requires determining “all controls that are necessary to implement the information security risk treatment option(s) chosen”, with a note that organizations “can design controls as required, or identify them from any source”; 6.1.3 c) then requires comparing the controls determined “with those in Annex A” and verifying “that no necessary controls have been omitted”.4 27005’s 8.3 and 8.4 follow the same order.2 Controls are chosen to treat risks; Annex A is then used as a completeness check.

The SC 27 auditing practices note on Annex A lists two improper uses: treating Annex A as a comprehensive list of controls, and treating it as a requirement list, since “the shalls in Annex A apply only if the organization determines that the specific control is relevant”.23 The note is from the ISO/IEC 27001 Auditing Practices Group and is not endorsed by ISO or SC 27.23 The companion article on ISO/IEC 27002:2022 covers the reference controls and their attributes.

A useful discipline is to say which risk factor each control acts on: preventing the event, reducing its success once initiated, detecting it, or limiting the consequence. Given the definition’s reminder that controls may not work as intended, each residual rating should state which controls it assumes are working and how well.2

The Statement of Applicability

27001 6.1.3 d) requires an SoA containing the necessary controls, the justification for their inclusion, whether they are implemented or not, and the justification for excluding any Annex A controls.4 The SC 27 SoA note says the standard “specifies what the SOA must contain. It does not specify how it should be structured”, that necessity can come from risk assessment or from “contractual or legal obligations”, and that a necessary control performed by an external organization “must still be included in the SOA”.24 In 27005’s contents the SoA (8.5) comes before the treatment plan (8.6), so it records decisions, including decisions to implement controls not yet in place.2

The plan, approval and residual acceptance

27001 6.1.3 e) and f) require a risk treatment plan and “risk owners’ approval of the information security risk treatment plan and acceptance of the residual information security risks”.4 27005 gives approval and acceptance separate subclauses, 8.6.2 and 8.6.3.2 6.1.3 f) does not prescribe how these decisions are recorded. Our proposed implementation keeps three quantities apart: the forecast residual, the level expected once the plan is implemented, which the owner accepts conditionally; the current exposure while the plan is in progress; and the assessed residual after implementation, when the controls can be checked. Neither plan approval nor acceptance of a forecast residual authorizes carrying the current exposure. That needs its own decision under the acceptance criteria, which 27005 6.4.2 says can allow short-term retention above the criteria with approval and a commitment to controls within a defined period.15 The definitions support the rest: retention can be restricted to a period, accepted risks are monitored and reviewed, and residual risk can contain unidentified risk, so acceptance should be recorded against the scenario as assessed, with its assumptions.2

Worked example: a mid-sized SaaS firm

Everything in this section is our illustration. The firm, its figures, its estimates and its decisions are invented, and no calibration data stands behind the ranges. The control numbers and titles are those of ISO/IEC 27002:2022.16

The firm sells a business-to-business invoicing platform, has about 400 staff, runs on one public cloud in two regions, holds invoice and payment-contact data for some 2,000 business customers and their counterparties (about 1.5 million records), and is certified to 27001:2022. Its method uses an event-based pass each year (the strategic cycle) and asset-based assessments each quarter and on defined triggers (the operational cycle).

Risk criteria

Consequence scale. A scenario’s band is the highest band reached on any anchor. The financial, availability and likelihood bands include their lower bounds and exclude their upper bounds. Record-count ranges include both stated endpoints.

BandFinancialPersonal dataAvailability (hours during which more than 10% of customers cannot use the service)Legal and regulatory
C1Under EUR 10,000No records exposed, not notifiableUnder 1 hourNone
C2EUR 10,000 to 100,0001 to 99 records exposed, not notifiable1 to 4 hoursContract breach notice from one customer
C3EUR 100,000 to 1 million100 to 999 records, or any notifiable breach affecting fewer than 1,000 records, including one with no records confirmed exposed4 to 24 hoursRegulator inquiry
C4EUR 1 million to 10 million1,000 to 99,999 records24 to 72 hoursRegulator investigation
C5EUR 10 million or more100,000 records or more72 hours or moreEnforcement action or loss of a licence

Outages affecting 10% of customers or fewer are rated on the financial and legal anchors only.

Likelihood scale. Expected number of occurrences of the scenario’s stated end event over 12 months, using the controls currently operating for a current rating and the controls assumed in place for a forecast.

BandOccurrences per year
L1Under 0.02
L20.02 to 0.1
L30.1 to 0.5
L40.5 to 2
L52 or more

Level of risk (lookup table approved by the executive committee)

C1C2C3C4C5
L5MediumHighVery highVery highVery high
L4LowMediumHighVery highVery high
L3LowMediumHighHighVery high
L2LowLowMediumHighHigh
L1LowLowLowMediumHigh

Acceptance criteria (the firm’s policy; the separate rule for current exposure is our proposed implementation of 27005 6.4.2’s conditional, short-term retention)

LevelResidual may be accepted byRetention of current exposure while a plan runs
LowRisk ownerReviewed at the next strategic cycle
MediumRisk owner, with the CISO’s written concurrenceReviewed at least annually
HighExecutive committeeUp to six months, with an approved plan
Very highNot acceptable as a residualExecutive committee exception for up to 30 days, during which interim measures must bring the assessed level to High or below; if they do not, escalation to the board

Criteria for performing assessments. Two assessors rate each scenario independently before discussion. Every C5 scenario, every tie among the five highest-ranked risks and every scenario that crosses an acceptance threshold when either rating moves one band also gets a quantitative range. Triggers for an operational assessment: a new product or region, a new critical supplier, a major incident, a change to identity, deployment or data storage architecture, a new legal requirement, completion of a treatment plan item, a failed recovery test, or a plan item more than 30 days late.

Register lines

E-01 (event-based, strategic scenario)

FieldEntry
Risk source and its objectiveFinancially motivated extortion group (intentional human source); its objective is payment, by stealing customer data and threatening publication
Business objective at riskConfidentiality of customer data; obligations to customers, counterparties and regulators
End eventExfiltration of 100,000 or more customer records followed by an extortion demand
Path that can reach the end eventA-12: a support agent’s account is compromised and the support tool’s impersonation feature is used to export all customers’ data. The example assumes that the pipeline path A-07 is limited to EU data and cannot extend access through another path. It contributes no additional route to the E-01 end event and is rated separately at C4
Risk ownerChief Operating Officer
Controls assumed operating (20 November 2026)Single sign-on with push-based MFA; support tool audit log; endpoint protection (8.7); daily backups (8.13)
Rating, 20 November 2026C5 (data anchor); L3, the assessors’ estimate of 0.1 to 0.5 occurrences a year through A-12. Level: Very high
Illustrative quantitative rangeLoss per event EUR 3 million to 30 million (90% range, assessors’ judgement only, no calibration data). The data anchor sets C5 whatever the financial outcome
Treatment optionModify (likelihood and consequence); share (insurance for part of the financial consequence)

A-07 (asset-based, operational scenario)

FieldEntry
Primary assetsCustomer data in the EU production database (about 60,000 records); integrity of the EU production service
Supporting assetCI/CD pipeline and its stored cloud deployment credential, which can deploy only to EU workloads, and those workloads can read only the EU database
Threat and end eventTheft of the credential through a compromised developer account or pipeline plug-in, leading to exfiltration of EU customer data or tampering with the EU service
VulnerabilitiesLong-lived static credential; third-party plug-ins not pinned to reviewed versions
Risk ownerVP Engineering
Controls assumed operatingMFA on source control; branch protection and peer review (8.32)
RatingC4. For exfiltration, the assessors assume exposure of about 60,000 records and a regulator investigation without enforcement. For tampering, they assume changes stay within the EU service and that redeployment and data reconciliation restore it in under 72 hours. Their combined financial estimate for one incident is EUR 1 million to under EUR 10 million, including recovery and customer claims. These are assumptions to test. L3 for incidents causing exfiltration or tampering, counting an incident that causes both once. Level: High

N-03 (event-based, non-adversarial)

FieldEntry
Risk source and end eventTechnical or environmental failure of the primary cloud region (source event), causing the service to be unavailable to all customers until it is restored in the second region (end event)
Business objective at riskAvailability commitments to customers
Risk ownerChief Technology Officer
Controls assumed operatingMultiple availability zones in the primary region (8.14); backups replicated to the second region (8.13); recovery runbook drafted, not yet tested
RatingProvisional: C3, on an assumed recovery time of 8 to 16 hours taken from the drafted runbook’s step timings, not yet demonstrated; L2. Level: Medium. If recovery took 24 to 72 hours the scenario would be C4, and from 72 hours C5; at L2 either would be High
Treatment optionRetain provisionally; test the recovery assumption. Active-active across regions was costed and rejected for this cycle

Treatment plan entries

Plan itemRiskActions and controlsOwnerDueForecast residual and its basis
RTP-26-04E-01Interim, by 18 December 2026: number-matching MFA re-enrolment for support staff; export alerting. Full, by 31 March 2027: phishing-resistant authenticators for support and admin staff (8.5); just-in-time impersonation approved per session (8.2); blocking of export above a shared limit of 500 records per rolling hour per account across all export paths (API, support tool, reporting), with coverage and aggregation verified by test (8.12, 8.16); immutable backups (8.13); extortion playbook and incident response retainer (5.24); cyber insurance (share)COO31 March 2027C5, L1: High. The assessors estimate fewer than 0.02 occurrences a year of the stated end event after the controls are in place. This illustrative estimate assumes the rate limit applies across all export paths used by each account, separate approval is required for each impersonation session, and containment stops exports from all accounts involved within two hours of the first unauthorized export. With those assumptions, one account can export at most about 1,000 records in that interval, and reaching 100,000 records before containment would require at least 100 accounts. The assessors must verify those assumptions at reassessment. Any event that reaches the threshold remains C5.
RTP-26-05A-07Short-lived workload identity federation and per-environment roles (8.2, 8.5); signed build provenance (custom control C-02); pinned, reviewed plug-ins (8.25); alerts on deployment role use outside pipeline runs (8.15, 8.16)VP Engineering28 February 2027C4, L1: Medium. With the proposed controls operating, the assessors estimate fewer than 0.02 incidents a year in which compromise via the pipeline causes EU-data exfiltration or EU-service tampering. The consequence assumptions stay the same.
RTP-26-06N-03First recovery test with measured recovery time, then twice a year (5.30). If recovery takes 24 hours or more, or the test fails to restore service, the CTO owns remediation and N-03 is reassessedCTO30 June 2027The test supplies evidence for the recovery estimate. If the revised estimate is C4 or C5 at L2, N-03 is High and goes to the executive committee

Decisions recorded on 20 November 2026 (illustrative). The COO approved RTP-26-04, and the COO and the executive committee accepted E-01’s High forecast residual conditional on completion and verification of the controls. The VP Engineering approved RTP-26-05 and accepted A-07’s forecast residual of Medium, with the CISO’s written concurrence. The CTO approved RTP-26-06 and provisionally accepted N-03 at Medium, with the CISO’s written concurrence, until the first recovery test. Because E-01’s current level was Very high, the executive committee granted a 30-day exception to 20 December 2026. A-07’s current level of High was retained by the executive committee until 28 February 2027 under the High rule.

Events in December 2026 (illustrative). The interim measures were in place on 18 December. On 19 December the assessors reassessed E-01 at C5, L2, level High. They judged that number matching reduces inadvertent approval of unsolicited prompts and that export alerts give responders a chance to stop an export before it reaches 100,000 records. On those assumptions, they estimated 0.02 to under 0.1 occurrences a year of exfiltration of at least 100,000 records followed by an extortion demand. The executive committee then retained E-01’s current High exposure until 31 March 2027 under the High rule. When any plan item closes, slips by more than 30 days or a test fails, the owner receives a reassessment showing the assessed level against the forecast, and a slip or failure returns the decision on current exposure to the executive committee.

A one-band sensitivity check shows why the forecast assumptions matter. If the assessors’ L1 estimate for A-07’s forecast were L2 instead, C4 at L2 would be High, and the executive committee would also need to accept the residual under the firm’s criteria.

The insurance limit is not evaluated here. Judging it would need the policy terms, exclusions and retention, and a modelled distribution of covered losses, none of which the example contains.

SoA extract (illustrative, as of 20 December 2026)

ControlNecessaryImplementedJustification
5.24 Information security incident management planning and preparationYesPartly: general plan in place; extortion playbook and retainer due 31 March 2027 (RTP-26-04)E-01; customer contracts require breach notification within 48 hours
5.30 ICT readiness for business continuityYesPartly: runbook drafted, untested; first test due 30 June 2027 (RTP-26-06)N-03; customer service level commitments
8.2 Privileged access rightsYesPartly: just-in-time impersonation and pipeline roles due under RTP-26-04 and RTP-26-05E-01, A-07
8.5 Secure authenticationYesPartly: SSO with push MFA for all staff; number-matching MFA for support staff since 18 December 2026; phishing-resistant authenticators due 31 March 2027E-01, A-07
8.12 Data leakage preventionYesPartly: export alerting deployed 18 December 2026; blocking due 31 March 2027E-01
8.13 Information backupYesPartly: daily, cross-region backups in place; immutable copies, required by RTP-26-04, due 31 March 2027E-01, N-03
8.14 Redundancy of information processing facilitiesYesYes, within one region; cross-region active-active not adoptedN-03, provisionally retained at Medium
8.30 Outsourced developmentNoNot applicableExcluded: no system development is outsourced; contractors work inside the firm’s own development process under 8.25. Review if outsourcing begins
C-02 Signed build provenance (custom; maps to 8.25 and 8.32)YesNo: due 28 February 2027 (RTP-26-05)A-07

The extract shows the trace an auditor follows: numeric criteria; a strategic scenario with a stated end event and the path that can reach it; a separate path rated in its own right because it cannot; current exposure handled by a dated exception, then by the High rule; plan approval and residual acceptance recorded for every plan; implementation status as of a date; one justified Annex A exclusion; and one necessary control from outside Annex A, mapped to it.

Comparison with NIST SP 800-30 and CSF 2.0

NIST SP 800-30 Rev. 1

NIST Special Publication 800-30 Revision 1, Guide for Conducting Risk Assessments, was published in September 2012 and amplifies the guidance in SP 800-39.17 SP 800-39 (March 2011) sets out the organization-wide risk management process, with the details of assessing, responding to and monitoring risk left to supporting publications; SP 800-30 describes that process as framing, assessing, responding to and monitoring risk, and covers only the assessment component.2517 Its three tiers, the organization (Tier 1), mission/business process (Tier 2) and information system (Tier 3), are levels at which assessments are conducted and their results used. Its assessment process has four steps: prepare, conduct, communicate results, and maintain.17 Treatment decisions, and any approval chain for them, belong to the response component, outside SP 800-30.

Its threat model is more explicit than 27005’s public text. Table D-2 gives a taxonomy of threat sources in four types: adversarial (individuals, groups, organizations or states, characterized by capability, intent and targeting), accidental (erroneous actions by users and administrators), structural (failures of equipment, environmental controls or software) and environmental (natural or man-made disasters and failures of critical infrastructure).17 27005’s three risk source types, human (intentional or unintentional), environmental and technical, correspond approximately: adversarial and accidental to human, structural to technical, environmental to environmental.2

SP 800-30 describes a three-step likelihood determination: the likelihood that a threat event will be initiated (adversarial) or will occur (non-adversarial); the likelihood that it results in adverse impact; and the combination of the two into an overall likelihood.17 For adversarial threats, the likelihood of initiation is based on “adversary intent”, “adversary capability” and “adversary targeting”, and the likelihood that an initiated event causes adverse impact is a separate estimate; for others it is estimated “using historical evidence, empirical data, or other factors”; and it is assessed against a stated time frame.17 A single likelihood scale that merges “will it be attempted?” with “will it succeed against our controls?” risks blurring the two; separating them is a discipline any 27005 method can adopt.

NIST CSF 2.0

The NIST Cybersecurity Framework 2.0 (CSWP 29, 26 February 2024) states outcomes and “does not prescribe how outcomes should be achieved”.26 Under GOVERN, Risk Management Strategy (GV.RM) includes agreed risk management objectives (GV.RM-01), risk appetite and risk tolerance statements (GV.RM-02), integration with enterprise risk management (GV.RM-03), strategic direction on appropriate risk response options (GV.RM-04), and a standardized method for calculating, documenting, categorizing and prioritizing cybersecurity risks (GV.RM-06).26 Under IDENTIFY, Risk Assessment (ID.RA) runs from identifying vulnerabilities in assets (ID.RA-01), through threats (ID.RA-03), likelihoods and impacts (ID.RA-04) and their use “to understand inherent risk and inform risk response prioritization” (ID.RA-05), to risk responses that are chosen, prioritized, planned, tracked and communicated (ID.RA-06).26

GV.RM-07 asks that strategic opportunities, which CSF calls positive risks, be characterized and included in organizational cybersecurity risk discussions.26 27005’s exclusion is narrower in scope: it removes pursuing an opportunity from the treatment options for information security risk, without saying anything about discussing opportunities.2 The two are compatible. CSF’s Tiers, Partial (1) to Adaptive (4), “reflect an organization’s practices for managing cybersecurity risk” and are a different thing from SP 800-30’s tiers, despite the shared word.2617

Where they agree and differ

AspectISO/IEC 27005:2022NIST SP 800-30 Rev. 1Open FAIR (O-RT, O-RA)
StatusInternational guidance supporting certifiable 27001US federal guidance on the assessment component of SP 800-39Open Group standards for a risk taxonomy and analysis method
ScopeAssessment and treatment, through owner approval and residual acceptanceAssessment; response is in SP 800-39Analysis of loss exposure for defined scenarios
IdentificationEvent-based and asset-based, combinableThreat-, asset/impact- or vulnerability-oriented, with a second orientation suggestedLoss scenario with asset and threat agent
Risk sourcesHuman (intentional or unintentional), environmental, technicalAdversarial, accidental, structural, environmentalThreat agents or communities
LikelihoodQualitative or quantitativeInitiation or occurrence, then adverse impact, then overall; stated time frameLoss event frequency within a timeframe
ConsequenceQualitative or quantitativeImpact levelsLoss magnitude in currency, as a distribution
CombinationLeft to the methodExample tables; no algorithm for semi-quantitative valuesFactor model

The 27005 and SP 800-30 columns are from the sources cited in this section. In the Open FAIR taxonomy, loss event frequency is “the probable frequency, within a given timeframe, that a Threat Agent will inflict harm upon an Asset”, and loss magnitude is “the probable magnitude of economic loss resulting from a Loss Event (measured in units of currency)”, expressed “as a distribution of losses, not a single value”.27 All three treat risk as a combination of likelihood and consequence of events. They differ in what they spell out: SP 800-30 says more about threats and likelihood, Open FAIR about quantification, and 27005 about the decision chain from treatment to residual acceptance that 27001 audits.

Privacy risk beyond security

ISO/IEC 27701:2025

The 2019 edition of ISO/IEC 27701 was an extension to 27001 and 27002. Its 5.4.1.2 refined 27001’s risk assessment: the organization had to apply a privacy risk assessment process to identify risks related to the processing of PII, and assess consequences “for both the organization and PII principals”; a note allowed either an integrated information security and privacy risk assessment process or two separate ones.28 ISO/IEC 27701:2025 (opens in a new tab), published on 14 October 2025, was “redrafted as a stand-alone management system standard”.297 Its contents now carry their own risk clauses: 6.1.2 Privacy risk assessment, 6.1.3 Privacy risk treatment, 8.2 Privacy risk assessment and 8.3 Privacy risk treatment, with normative Annex A reference controls for PII controllers and processors.29

UKAS’s transition bulletin lists among the main changes that the new edition “[f]ormally embedded privacy risk management within the management system”, and says ISO/IEC 27706:2025 requires “structured evaluation of privacy risk management” during PIMS assessments. UKAS expects accredited certification bodies to have transitioned by 31 October 2027 and their certified clients by 31 October 2028.30 The bulletin at that address is Revision 1, dated 18 August 2026, replacing the original of 18 March 2026.30

Privacy risk assessment was therefore already required in 2019; what changed in 2025 is that it sits in a stand-alone PIMS with its own clauses. Whether one method, set of owners and register can serve both an ISMS and a PIMS is an implementation choice. The public preview shows clause titles, not the 2025 requirement text, so any shared process has to be checked against each standard’s requirements in full. 27701:2025’s bibliography lists ISO/IEC 27005, ISO/IEC 27557 and ISO/IEC 29134 (privacy impact assessment) as related documents.29

ISO/IEC 27557:2022

ISO/IEC 27557:2022 (opens in a new tab), Application of ISO 31000:2018 for organizational privacy risk management, is a 19-page guidance standard published in November 2022.317 ISO’s abstract says it extends ISO 31000:2018 to organizational privacy risk and “distinguishes between the impact that processing PII can have on an individual with consequences for organizations (e.g. reputational damage)”. It gives guidance for bringing into the overall organizational risk assessment both “organizational consequences of adverse privacy impacts on individuals” and “organizational consequences of privacy events that damage the organization (e.g. by harming its reputation) without causing any adverse privacy impacts to individuals”.31

What auditors find

The sources found for this article are one certification body’s audit data, an SC 27 journal article and an accreditation checklist.

DNV, a certification body, analysed its 2018 audits of more than 1,700 organizations certified to 27001, then in its 2013 edition. In that sample, “[a] total of 27% of organizations do not meet the requirements” of 6.1.2, usually for two reasons: the approach “does not ensure the consistency and the validity of results”, and “not all relevant risks are identified”. Under 6.1.3 it reported treatment plans that do “not include deadlines and responsibilities for the actions” and Annex A exclusions that “are not correctly justified”.32 The data is historical and predates the 2022 editions.

The SC 27 journal article, written by a WG 1 expert and stating the author’s views, lists “the most common issues that ISMS auditors experience” with information security risk management: risk management that “does not cover the entire ISMS scope” (for example only IT systems, only information on the organization’s sites, or developed software but not the information); an approach “not flexible enough for risk sources specific to the organization’s context”; an approach that “requires a lot of data and cannot be maintained”; “too many detailed threats” not consistently addressed; an assessment that is “actually a vulnerability report”; and “controls are not linked to the risk sources they are meant to address”.5 These are reported experience, not measured frequencies.

Accreditation criteria say what certification bodies are expected to check. The Hong Kong Accreditation Service’s checklist for ISMS certification bodies, based on ISO/IEC 27006-1:2024, asks whether the certification body ensures that the client’s assessments “produce consistent, valid and comparable results if repeated”, and whether interfaces and dependencies, and the associated risks, are identified.33 It gives no data on how often these fail.

Taken together, the sources report problems with consistency and validity, incomplete identification and scope, unmaintainable detail, plans without deadlines or responsibilities, and controls not traced to risks. The remedies in this article (numeric anchors, independent ratings, joint scenarios, dated plans) are our recommendations for addressing them, not findings of the sources.

What a practitioner should do

The table is our synthesis, limited to decisions and tests.

DoTest or decision it supports
Define likelihood bands by a stated end event and period, and consequence bands by numeric anchors with each boundary in one bandTwo assessors can check each other’s ratings
Have two assessors rate a sample independently, then compareConsistency under 6.1.2 b); agreement does not show the inputs are right, so check validity separately against incidents, loss data and threat intelligence
Move each rating one band either wayIf a scenario crosses an acceptance threshold, quantify it before deciding
Record plan approval, conditional acceptance of the forecast residual and the decision on current exposure separately, with datesEach decision has an owner and authority under the criteria
Reassess when a plan item closes, slips by more than 30 days or a test failsA slip or failure returns the current-exposure decision to the authority the level requires
State SoA implementation status as of a dateThe SoA matches the plan and the register
If a PIMS is in scope, define impact-on-individuals criteria (our recommendation) drawing on 27557, and check any shared process against both standardsPrivacy risk has its own clauses in 27701:2025

Conclusion

ISO/IEC 27005:2022 gives a process, with its structure aligned to 27001 and its terminology aligned to ISO 31000 (with definitions also drawn from ISO Guide 73 and ISO 17666), that carries a risk from criteria through identification, analysis and evaluation to a chosen treatment, controls checked against Annex A, a Statement of Applicability, an approved plan and an accepted residual. The worked example’s main finding is that the trace holds only when each number follows from the stated criteria: an end event defined precisely enough to say which path can reach it, a forecast whose assumptions are written down, and a current exposure that needs its own dated decision because accepting a forecast does not cover it. A one-band increase in A-07’s forecast likelihood would require executive committee acceptance. Consistency between assessors is testable within the method; validity needs evidence from outside it. The standard’s main gap is the arithmetic of risk levels, which it leaves to the method. The 2022 edition remains current, with a preliminary work item for its successor registered in July 2026 and ISO 31000 under revision.

Footnotes

  1. ISO/IEC 27005:2022, Information security, cybersecurity and privacy protection: Guidance on managing information security risks, catalogue entry with FAQ and life cycle, ISO, accessed 27 November 2026. https://committee.iso.org/standard/80585.html (opens in a new tab) ↩1 ↩2 ↩3 ↩4
  2. ISO/IEC 27005:2022, preview of foreword, introduction, scope, normative references, Clause 3 terms and definitions, contents and bibliography, published by the GCC Standardization Organization (GSO), accessed 27 November 2026. https://gso-sims-preview-doc-aws.s3-eu-west-1.amazonaws.com/iso-iec-27005-2022-en.html (opens in a new tab) ↩1 ↩2 ↩3 ↩4 ↩5 ↩6 ↩7 ↩8 ↩9 ↩10 ↩11 ↩12 ↩13 ↩14 ↩15 ↩16 ↩17 ↩18 ↩19 ↩20 ↩21 ↩22 ↩23 ↩24 ↩25 ↩26 ↩27 ↩28 ↩29 ↩30 ↩31
  3. Vlerë Hyseni and Ernis Kabashi, “ISO/IEC 27005:2022: Main Changes and Implications”, PECB (a training and personnel certification body), undated, accessed 27 November 2026. https://pecb.com/en/article/iso-iec-270052022-main-changes-and-implications (opens in a new tab) ↩1 ↩2 ↩3
  4. ISO/IEC 27001:2022 redline preview against the 2013 edition (foreword, introduction and Clauses 1 to 7.4), published by the Slovenian Institute for Standardization (SIST), accessed 27 November 2026. https://preview.sist.si/sist-preview/82875/4d4c8d99950c4b39aaa39cf5cb9a0bf3/ISO-IEC-27001-2022.pdf (opens in a new tab) ↩1 ↩2 ↩3 ↩4 ↩5 ↩6 ↩7 ↩8 ↩9 ↩10 ↩11
  5. Pablo Corona-Fraga, “Risk management process”, SC 27 Journal, Volume 3, Issue 4, ISO/IEC JTC 1/SC 27 N 23202, October 2023 (views of the author, not of ISO or SC 27). https://committee.iso.org/files/live/sites/jtc1sc27/files/resources/ISO-IEC%20JTC%201-SC%2027_N23202_SC27%20Journal%20Vol%203%20Issue%204.pdf (opens in a new tab) ↩1 ↩2 ↩3 ↩4 ↩5 ↩6
  6. ISO 31000:2018, Risk management: Guidelines, catalogue entry with FAQ and life cycle, ISO, accessed 27 November 2026. https://committee.iso.org/standard/65694.html (opens in a new tab) ↩1 ↩2
  7. ISO Open Data, deliverables metadata (references, editions, publication dates, stages, page counts, scopes and successor records), ISO, latest file downloaded and searched 27 November 2026. https://isopublicstorageprod.blob.core.windows.net/opendata/_latest/iso_deliverables_metadata/json/iso_deliverables_metadata.jsonl (opens in a new tab) ↩1 ↩2 ↩3 ↩4 ↩5 ↩6
  8. ISO/IEC 27005:2018, redline sample comparing the third edition with the second (foreword, contents and introduction), iTeh Standards, accessed 27 November 2026. https://cdn.standards.iteh.ai/samples/75281/51b0464985e14aa9860c4ba3961f0b68/ISO-IEC-27005-2018.pdf (opens in a new tab) ↩1 ↩2 ↩3 ↩4
  9. “Understanding the Differences Between ISO 27005:2018 and ISO 27005:2022”, Drata (a compliance software vendor), page dated 3 March 2026, accessed 27 November 2026. https://drata.com/learn/iso-27001/iso-27005-2018-vs-2022 (opens in a new tab) ↩1 ↩2 ↩3
  10. ISO/IEC PWI 27005, project record (current stage 00.00, effective 9 July 2026), Institute for Standardization of Serbia, accessed 27 November 2026. https://iss.rs/en/project/show/iso%3Aproj%3A94941 (opens in a new tab) ↩
  11. ISO/IEC 27005:2022, sample pages including Clauses 4, 5 and the start of 6, iTeh Standards (standards distributor), accessed 27 November 2026. https://cdn.standards.iteh.ai/samples/80585/7bca93ac16fd426a9bc717cadc9284d9/ISO-IEC-27005-2022.pdf (opens in a new tab) ↩1 ↩2 ↩3 ↩4 ↩5 ↩6 ↩7 ↩8
  12. ISO/IEC 27001:2022, preview of foreword, introduction, Clauses 1 to 3 and contents, published by the GCC Standardization Organization (GSO), accessed 27 November 2026. https://gso-sims-preview-doc-aws.s3-eu-west-1.amazonaws.com/iso-iec-27001-2022-en.html (opens in a new tab) ↩1 ↩2
  13. SC 27 Journal 2025 (Issue 1), article on AI-related risk management, ISO/IEC JTC 1/SC 27, 2025 (views of the authors). https://committee.iso.org/files/live/sites/jtc1sc27/files/resources/Journal%202025.pdf (opens in a new tab) ↩
  14. ISO/IEC 27001:2022, 8.2 and 8.3, expanded redline preview, iTeh Standards. https://standards.iteh.ai/catalog/standards/iso/7e4528c6-425d-4b7c-b742-c92eec7fd9cb/iso-iec-27001-2022 (opens in a new tab) ↩
  15. ISO/IEC 27005:2022, catalogue page with expanded preview of the published text through part of 6.4.2 (subclause notes for 6.1, 6.2, 6.3 and 6.4.2; 6.4.2 items b), f) and h)), iTeh Standards, accessed 27 November 2026. https://www.theiteh.com/catalog/standards/iso/a81e3455-413d-48cd-9a3c-71cd98fbe1e1/iso-iec-27005-2022 (opens in a new tab) ↩1 ↩2 ↩3 ↩4
  16. ISO/IEC 27002:2022, preview of foreword, introduction, scope, Clause 3 and contents, published by the GCC Standardization Organization (GSO), accessed 27 November 2026. https://gso-sims-preview-doc-aws.s3-eu-west-1.amazonaws.com/iso-iec-27002-2022-en.html (opens in a new tab) ↩1 ↩2
  17. NIST, Special Publication 800-30 Revision 1, Guide for Conducting Risk Assessments, September 2012, DOI 10.6028/NIST.SP.800-30r1: sections 2.1 to 2.4, 3, and Appendices D and I. https://csrc.nist.gov/pubs/sp/800/30/r1/final (opens in a new tab) ↩1 ↩2 ↩3 ↩4 ↩5 ↩6 ↩7 ↩8 ↩9 ↩10 ↩11 ↩12
  18. Florence Esselin, “EBIOS Risk Manager: accessible methodology to secure digital transformation”, Note 62, Centre de recherche de l’École des officiers de la Gendarmerie nationale (CREOGN), October 2021 (English version). https://gendarmerie.interieur.gouv.fr/crgn/content/download/43569/file/NOTE_62_CREOGN_Ebios_Risk_anglais.pdf (opens in a new tab) ↩1 ↩2
  19. “EBIOS, ISO 27001 or ISO 27005: which method to use to manage cybersecurity risks?”, ORSYS Le Mag (ORSYS, a training company), 21 January 2025. https://www.orsys.fr/orsys-lemag/en/ebios-iso-27001-or-iso-27005-which-method-for-cyber-security-risks (opens in a new tab) ↩
  20. Louis Anthony Cox Jr., “What’s wrong with risk matrices?”, Risk Analysis 28(2), April 2008, pages 497 to 512, abstract, PubMed ID 18419665. https://pubmed.ncbi.nlm.nih.gov/18419665/ (opens in a new tab) ↩1 ↩2
  21. David V. Budescu, Stephen Broomell and Han-Hui Por, “Improving communication of uncertainty in the reports of the Intergovernmental Panel on Climate Change”, Psychological Science 20(3), March 2009, pages 299 to 308, abstract, PubMed ID 19207697. https://pubmed.ncbi.nlm.nih.gov/19207697/ (opens in a new tab) ↩
  22. SIST ISO 31000:2018 (identical to ISO 31000:2018), sample pages including the contents, iTeh Standards, accessed 27 November 2026. https://cdn.standards.iteh.ai/samples/65694/0c31a934cd01431c94c33185a97adeac/SIST-ISO-31000-2018.pdf (opens in a new tab) ↩
  23. ISO/IEC 27001 Auditing Practices Group, “Auditing Practices Note: What is Annex A?”, ISO/IEC JTC 1/SC 27/WG 1 N 3297, 11 September 2022 (not endorsed by ISO or SC 27, per its disclaimer). https://committee.iso.org/files/live/sites/jtc1sc27/files/resources/ISO-IECJTC1-SC27-WG1_N3297_Auditing%20Practices%20Note%20-%20Annex%20A.pdf (opens in a new tab) ↩1 ↩2
  24. ISO/IEC 27001 Auditing Practices Group, “Auditing Practices Note: Statement of Applicability (SoA)”, ISO/IEC JTC 1/SC 27/WG 1 N 3298, 11 September 2022 (not endorsed by ISO or SC 27, per its disclaimer). https://committee.iso.org/files/live/sites/jtc1sc27/files/resources/ISO-IECJTC1-SC27-WG1_N3298_Auditing%20Practices%20Note%20-%20SoA.pdf (opens in a new tab) ↩
  25. NIST, Special Publication 800-39, Managing Information Security Risk: Organization, Mission, and Information System View, March 2011, publication page and abstract. https://csrc.nist.gov/pubs/sp/800/39/final (opens in a new tab) ↩
  26. The NIST Cybersecurity Framework (CSF) 2.0, NIST CSWP 29, NIST, 26 February 2024. https://nvlpubs.nist.gov/nistpubs/CSWP/NIST.CSWP.29.pdf (opens in a new tab) ↩1 ↩2 ↩3 ↩4 ↩5
  27. The Open Group, Risk Taxonomy (O-RT), Version 3.0.1, November 2021, sections 2 and 4 (Loss Event Frequency, Loss Magnitude). Archived copy of the online text captured 27 September 2023. https://web.archive.org/web/20230927044040/https://pubs.opengroup.org/security/o-rt/ (opens in a new tab) ↩
  28. ISO/IEC 27701:2019, sample pages including 5.4.1.2 and 5.4.1.3, iTeh Standards, accessed 27 November 2026. https://cdn.standards.iteh.ai/samples/71670/8a8bcac5d3614f63bf02ab5d6cc0c07c/ISO-IEC-27701-2019.pdf (opens in a new tab) ↩
  29. ISO/IEC 27701:2025, Privacy information management systems: Requirements and guidance, preview of foreword, introduction, contents and bibliography, published by the GCC Standardization Organization (GSO), accessed 27 November 2026. https://gso-sims-preview-doc-aws.s3-eu-west-1.amazonaws.com/iso-iec-27701-2025-en.html (opens in a new tab) ↩1 ↩2 ↩3
  30. Technical Bulletin: Transition Arrangements for Privacy Information Management Systems (PIMS) ISO/IEC 27701:2025 and ISO/IEC 27706:2025, Revision 1, UKAS, 18 August 2026 (replacing the bulletin of 18 March 2026). https://www.ukas.com/wp-content/uploads/2026/03/2026.03.18-Technical-Bulletin-Transition-Arrangements-for-Privacy-Information-Management-Systems.pdf (opens in a new tab) ↩1 ↩2
  31. ISO/IEC 27557:2022, Application of ISO 31000:2018 for organizational privacy risk management, catalogue entry with abstract, ISO, accessed 27 November 2026. https://committee.iso.org/standard/71675.html (opens in a new tab) ↩1 ↩2
  32. “Insights from auditing information security management systems”, DNV (a certification body), published 21 November 2019, analysing 2018 audit data. https://www.dnv.com/article/insights-from-auditing-information-security-management-systems-162216/ (opens in a new tab) ↩
  33. HKCAS 007 Annex II(F), Management System Checklist (for ISMS certification), based on ISO/IEC 27006-1:2024 and HKCAS SC-08, Hong Kong Accreditation Service, 1 April 2025. https://www.itc.gov.hk/en/quality/hkas/doc/hkcas/HKCAS007-A2F.pdf (opens in a new tab) ↩