Abstract
How does security enter each phase of software development, and how should an organisation judge software it buys rather than builds? Those are the two questions of the CISSP’s Domain 8. Our answer is a manager’s one: write security requirements before design, find defects where they can first be found, allow no one to change production unilaterally, test software against its requirements before an accountable official accepts the risk, and ask suppliers for evidence instead of trusting their claims. The five objectives keep their numbers and titles in the outline that takes effect on 15 April 2027, and the domain’s average weight rises from 10% to 11.2%. The new outline adds the Secure Software Development Framework, SBOM requirements, shift left, memory-safe languages and Function as a Service. It names software composition analysis under open source, removes interactive application security testing (IAST) from the listed testing examples and moves software-defined security to Domain 4. As of 27 November 2026, SSDF 1.2 is still a draft and OMB has rescinded its attestation memoranda M-22-18 and M-23-16.
Where Domain 8 sits
Exam logistics are in the series hub, The CISSP in late 2026. The English exam is adaptive, and ISC2 publishes an average weight for each domain, which does not fix the mix on any single exam.1 Candidates who sit before 15 April 2027 should, in ISC2’s words, “continue using the current CISSP Exam Outline”.2
A useful study habit for this domain: for any flaw in a scenario, ask who should have caught it, when, and under which control.
The two outlines side by side
| 2024 outline (exams to 14 April 2027) | 2027 outline (from 15 April 2027) | |
|---|---|---|
| Average domain weight | 10% | 11.2% |
| 8.1 | Understand and integrate security in the Software Development Life Cycle (SDLC) | unchanged |
| 8.2 | Identify and apply security controls in software development ecosystems | unchanged |
| 8.3 | Assess the effectiveness of software security | unchanged |
| 8.4 | Assess security impact of acquired software | unchanged |
| 8.5 | Define and apply secure coding guidelines and standards | unchanged |
Sources: the two ISC2 outline PDFs (weights on p. 3, Domain 8 on p. 14), both fetched on 27 November 2026.31
Bullet-level changes
- 8.1: the five 2024 bullets stay: development methodologies (Agile, Waterfall, DevOps, DevSecOps and the Scaled Agile Framework as examples), maturity models (CMM and SAMM), operation and maintenance, change management, and the Integrated Product Team. Two are added: “Secure Software Development Framework (SSDF) and Software Bill of Materials (SBOM) requirements” and “Shift left”. SBOMs are not new to the exam: both outlines list them as a supply chain risk mitigation under 1.11.
- 8.2: programming languages gain the examples “memory safe” and “object-oriented”. The application security testing examples shrink from SAST, DAST, software composition analysis and IAST to SAST and DAST.31 The other bullets (libraries, tool sets, IDE, runtime, CI/CD, software configuration management, code repositories) are unchanged.
- 8.3: unchanged: auditing and logging of changes; risk analysis and mitigation.
- 8.4: open source gains the example “Software Composition Analysis (SCA)”, and cloud services add “Function as a Service (FaaS)” to SaaS, IaaS and PaaS. COTS, third-party and managed services are unchanged.
- 8.5: “Software-defined security” is removed. It becomes the last bullet of 4.1, which ISC2 describes as “the placement of software-defined security within network architecture”.2 See CISSP Domain 4.
Two corrections to common study lists. IAST does not appear anywhere in the 2027 outline. SOAR is not a Domain 8 bullet in either outline; the 2027 outline places it under 7.2, logging and monitoring. BSIMM is named in neither.31
ISC2’s web page adds AI notes for Domain 8, such as “hallucinated” vulnerabilities from AI-assisted coding; the PDF bullets do not list them.4
8.1 Security in the SDLC
Life cycle models
A common teaching model of the SDLC has these activities: requirements, design, construction, testing, release, operation and retirement. Models differ in how they order and repeat them, which changes when security flaws are found.
- Waterfall runs the phases in sequence, with a sign-off at each gate where security can be checked. Its weakness is late feedback: a design flaw found in system testing reopens closed phases.
- Agile delivers working software in short iterations. The Agile Manifesto values “Individuals and interactions over processes and tools” and “Working software over comprehensive documentation”,5 and one of its principles is that “Working software is the primary measure of progress”.6 Security has to enter as backlog items, acceptance criteria and a definition of done.
- DevOps joins development and operations through automated build, test and deployment. It is an operating approach that can sit alongside an iterative life cycle. DevSecOps builds security checks into the automation, which makes the pipeline a security control that needs protecting.
- Scaled Agile Framework (SAFe) is a commercial framework for running Lean and Agile practices across many teams.7 At scale, security requirements must stay consistent across teams that release independently.
In every model, security requirements belong at the start with the functional ones, and acceptance testing checks the product against them. Accepting the residual risk is a separate decision. Under the NIST Risk Management Framework, “The explicit acceptance of risk is the responsibility of the authorizing official and cannot be delegated to other officials within the organization”.8 Outside government, the organisation’s governance designates who may accept risk, and that role should sit apart from the people who build the system.
Shift left
“Shift left” means moving security activities earlier on a timeline drawn from requirements on the left to operations on the right: threat modelling during design, analysis in the developer’s editor and on each commit, dependency checks before a library is adopted. It usually comes with the claim that defects cost more to fix the later they are found, for which the evidence is weak. A study of 171 projects found “no evidence for the delayed issue effect”.9 It covered defects in general, not security defects. A sounder argument concerns rework and exposure. Finding and fixing a new flaw in a pull request can prevent its release to production and avoid later remediation. OWASP lists SAST’s benefits as “early vulnerability detection, quick feedback and support for shift-left security practices”.10
The Secure Software Development Framework
NIST SP 800-218, Secure Software Development Framework (SSDF) Version 1.1, was published in February 2022 and superseded the 2020 white paper that defined version 1.0.11 NIST notes that “Few software development life cycle (SDLC) models explicitly address software security in detail”, so SSDF practices are meant to be added to whatever model is in use.11 The SSDF defines outcomes, not a life cycle, in four groups:1213
- Prepare the Organization (PO), for example PO.1 “Define Security Requirements for Software Development” and PO.5 “Implement and Maintain Secure Environments for Software Development”.
- Protect the Software (PS): PS.1 “Protect All Forms of Code from Unauthorized Access and Tampering”, PS.2 “Provide a Mechanism for Verifying Software Release Integrity” and PS.3 “Archive and Protect Each Software Release”.
- Produce Well-Secured Software (PW): from design and design review through secure coding, build configuration, code review and analysis (PW.7), executable testing (PW.8) and secure defaults (PW.9). PW.3 is a retired identifier; Table 1 records PW.3.1 as moved to PO.1.3 and PW.3.2 to PW.4.4.
- Respond to Vulnerabilities (RV): RV.1 “Identify and Confirm Vulnerabilities on an Ongoing Basis”, RV.2 “Assess, Prioritize, and Remediate Vulnerabilities” and RV.3 “Analyze Vulnerabilities to Identify Their Root Causes”.
Three tasks link to the rest of the domain. PS.1.1 stores all code “based on the principle of least privilege so that only authorized personnel, tools, services, etc. have access”. PS.3.2 shares “provenance data for all components of each software release (e.g., in a software bill of materials [SBOM])”. PW.4.4 verifies that “acquired commercial, open-source, and all other third-party software components comply with the requirements, as defined by the organization, throughout their life cycles”.13
Version status as of 27 November 2026. NIST published the initial public draft of SP 800-218 Revision 1, SSDF Version 1.2, on 17 December 2025 in response to Executive Order 14306. Comments closed on 30 January 2026.14 The draft adds PO.6, “Define and Implement a Continuous Process Improvement Plan”, and PS.4, on “robust and reliable software update strategies, preferably allowing customers to control any updates”.15 The CSRC record still lists version 1.1 as final, and we found no final Revision 1.11 Version 1.1 is therefore the current final NIST publication. The exam outline names the SSDF without a version.
Federal procurement. On 23 January 2026 OMB memorandum M-26-05 rescinded its earlier software attestation memoranda, M-22-18 and M-23-16. It said M-22-18 had “imposed unproven and burdensome software accounting processes”. Agencies “may choose to use” the Secure Software Development Attestation Form and may adopt contract terms requiring “a current software bill of materials (SBOM) upon request”.16 Acquirers can still ask suppliers for SSDF-aligned evidence; federally, it is now each agency’s choice.
Maturity models
A maturity model measures the process, not any single product. The SEI’s CMM for Software, version 1.1 (February 1993), defined five levels: Initial, Repeatable, Defined, Managed, Optimizing.17 Its successor CMMI, now maintained by ISACA’s CMMI Institute, uses Initial, Managed, Defined, Quantitatively Managed and Optimizing, plus a level 0, Incomplete.18 A list with Repeatable at 2 and Managed at 4 is the 1993 CMM.
OWASP SAMM version 2 is the security-specific model. It “defines five business functions and fifteen security practices”: Governance, Design, Implementation, Verification and Operations, with three practices each (Design has Threat Assessment, Security Requirements and Secure Architecture).19 SAMM is prescriptive, telling you what to do at each level, and OWASP provides an assessment toolbox for scoring a programme.20 BSIMM is descriptive and reports what participating firms do. Its publisher says the BSIMM16 report, published in January 2026, analysed 111 organisations.21 Neither model certifies a product.
Operation and maintenance, change management, integrated product teams
After release, patches, configuration changes and new features re-enter the life cycle, and each needs the same discipline as the first release. Change management is that discipline. SP 800-53 CM-3 requires an organisation to “Review proposed configuration-controlled changes to the system and approve or disapprove such changes with explicit consideration for security and privacy impact analyses”, and CM-3(4) places security representatives on the change board.22 For changes requiring formal review, NIST’s configuration management guide says to request and record the change, analyse its security impact, test it, obtain approval (usually from the change board), implement it, verify it and close the request. Unscheduled (emergency) changes follow expedited procedures and are “reviewed/resolved by the CCB as soon as is practical after” they are made. Changes made outside change control altogether need “retroactive analysis, testing, and approval”.23
An Integrated Product Team brings the functions a product needs together for its whole life, for example development, operations, security, legal and the business owner.
Worked example 1 (our own): security in each phase of a small project
A clinic wants a patient appointment portal built by a four-person agile team. We assume the clinic has classified the portal’s health data as high impact.
| Phase | Security activity | Output a manager can check |
|---|---|---|
| Initiation and requirements | Confirm the data classification; write security and privacy requirements; set acceptance criteria | Requirements traced to the classification |
| Design | Threat model the booking and login flows; choose authentication; design authorisation by record ownership | Threat model, design review sign-off |
| Construction | Secure coding standard (ASVS level chosen); IDE linting; peer review; SAST and SCA in the pipeline | Review records, triaged scan results |
| Testing | DAST against staging; security tests from the threat model; fuzz the file upload | Test report against the requirements |
| Release | Acceptance tests passed; the official with risk authority accepts or rejects the residual risk; release signed | Acceptance and risk acceptance records, signed artefacts |
| Operation and maintenance | Monitoring, vulnerability intake, patching through change management | Change records, dated vulnerability tickets |
8.2 Controls in the development ecosystem
Languages, libraries, tool sets, IDEs and runtimes
Memory-safe languages enter the 2027 outline as an example. The Case for Memory Safe Roadmaps (CISA, NSA, FBI and the cybersecurity authorities of Australia, Canada, the United Kingdom and New Zealand; 6 December 2023) asks manufacturers to publish roadmaps with phases, dates and a plan for dependencies written in C and C++.24 The report states that “two-thirds of reported vulnerabilities in memory unsafe programming languages still relate to memory issues”. It repeats a historical estimate that “About 70 percent of Microsoft common vulnerabilities and exposures (CVEs) are memory safety vulnerabilities (based on 2006-2018 CVEs)”, and notes that Rust code can use the unsafe keyword to set protections aside.25 CISA and NSA followed with Memory Safe Languages: Reducing Vulnerabilities in Modern Software Development on 24 June 2025.26 The manager’s point: a memory-safe language prevents classes such as buffer overflows and use-after-free in code that stays within the language’s guarantees. Unsafe blocks and C or C++ dependencies still need review, which is why the roadmaps include a dependency plan.
Object-oriented languages also appear in 2027: know encapsulation, inheritance, polymorphism, high cohesion and low coupling.
Libraries bring other people’s code into your product. The SSDF says to reuse “well-secured software” (PW.4) and keep verifying it (PW.4.4).13 Tool sets and IDEs are part of the attack surface: one implementation example under PO.3.2 is to “assess the security of each tool”.13 Runtimes add sandboxing and memory management, and patching obligations of their own.
CI/CD, software configuration management and repositories
Whoever can change a CI/CD pipeline can change what reaches production. CISA and NSA issued joint CI/CD guidance on 28 June 2023.27 Older principles supply many of the controls:
- Separation of duties (SP 800-53 AC-5) and access restrictions for change (CM-5).22 In a repository this usually means protected branches. GitHub, for example, can require “a specific number of approving reviews before someone merges”, and by default its branch protection rules disable force pushes.28 Review by someone other than the author enforces separation of duties only if it binds privileged roles too: by default GitHub’s rules “don’t apply to people with admin permissions” unless configured to, so the power to change or bypass the rule must itself be controlled. Dual authorisation (CM-5(4)) is stronger: it ensures that changes to selected components “cannot occur unless two qualified individuals approve and implement such changes”.22 No one person should change production alone.
- Developer configuration management (SA-10): the developer must “Document, manage, and control the integrity of changes” and “Implement only organization-approved changes”.22
- Code repositories: least-privilege access (SSDF PS.1.1), signed commits where supported, and secret scanning. NISTIR 8397 (section 2.4) recommends “heuristic tools to examine the code for hardcoded passwords and private encryption keys”.29
- Integrity of releases: SSDF PS.2.1 says to make “software integrity verification information available to software acquirers”, for example by publishing hashes or signing code.13 On the consumer side, CM-14 blocks installation of selected components “without verification that the component has been digitally signed using a certificate that is recognized and approved by the organization”.22 A signature shows origin and integrity only if the verifier checks it against a trusted key or identity, and only while the key and the signing workflow stay under control. A compromised build service will sign malware.
Application security testing
| Technique | What it examines | When it runs | Strength | Weakness |
|---|---|---|---|---|
| SAST | Source, bytecode or binaries, without executing | IDE, commit, pull request | Early; points to the line; can flag insecure settings held in source or configuration files | False positives; frameworks, reflection, generated code or dynamic configuration reduce coverage |
| DAST | The running application from outside | Staging, or production with care | Sees the effective runtime configuration; findings tied to observed behaviour | Needs a deployed build; covers only paths it reaches; no line numbers |
| IAST | Instrumented application while tests run | Test and QA | Sees code and runtime together | Language-specific agents; only exercised paths |
| SCA | Third-party components and versions | Build, and continuously after release | Known-vulnerable or end-of-life components and licence issues | Only known vulnerabilities; depends on accurate component identification |
| Fuzzing | Behaviour under malformed input | Test, often continuous | Finds crashes and memory errors no one thought to test | Many targets need a harness; findings need triage |
OWASP notes SAST “could produce false positives” and that “Frameworks, reflection, generated code or dynamic configurations could reduce coverage”.10 SP 800-53 has developer control enhancements for static code analysis (SA-11(1)), for dynamic code analysis (SA-11(8)), which covers runtime verification and includes fuzz testing, and for interactive testing (SA-11(9)), described as “observing applications as they run during testing”.22 Of dynamic testing in general, NISTIR 8397 (section 2.2) says it “has few, if any, false positives” because outputs are actually observed, and it notes that fuzzers “create huge numbers of inputs”.29 Precision and coverage vary by tool: static tools report more candidates, false positives included, while dynamic findings are grounded in behaviour but limited to the paths exercised. A false positive wastes effort; a false negative leaves a flaw undetected by that check.
Worked example 2 (our own): a pipeline with gates, and who may change it
| Stage | Gate | Fails the build when |
|---|---|---|
| Pull request | Secret scanning; SAST on changed files; review by a second developer | A secret is found; a new high-severity finding is untriaged; no approving review |
| Build | SCA against the resolved dependency graph (lockfile or built artefact); SBOM generated | A component has a known exploited vulnerability or a prohibited licence |
| Package | Artefact signed by the build service’s key, held in a hardware module | Signing fails |
| Staging | DAST and security regression tests | A high-severity finding is confirmed |
| Release | Change ticket approved; deployment verifies the signature | No approval, or the signature does not verify |
OWASP’s supply chain guidance covers threats from “both direct and transitive software dependencies” and recommends pinning them with lockfiles.30 A separate platform team owns the pipeline definitions, and their changes go through review and change management with an approver other than the author. No individual holds the signing key. Exceptions to a gate are approved by the risk owner, given an expiry date and logged. A developer who can switch off the SCA gate has defeated the control.
8.3 Assessing the effectiveness of software security
The outline’s 8.3 bullets are auditing and logging of changes, and risk analysis and mitigation.1 The first asks whether you can reconstruct who changed what, when, and with whose approval. The evidence is repository history, pull request approvals, pipeline logs, change tickets and deployment records. It must be protected from the people it records: SP 800-53 AU-9 says to “Protect audit information and audit logging tools from unauthorized access, modification, and deletion”.22 The second asks whether findings become decisions. Each validated weakness gets a risk rating, an owner, a treatment (fix, mitigate, transfer, accept) and a date. SSDF RV.3 adds root cause analysis, so that whole classes of defect stop recurring.13
If median time to remediate high-severity findings falls from 40 days to 12 in a quarter when the SAST rule set changed, the metric may reflect the tool, not the risk. The manager checks the scanner’s change log, samples closed tickets, and compares an unchanged source such as penetration test findings before trusting the trend.
Domain 6 covers security control testing and audits across all systems; see CISSP Domain 6. Domain 8 applies the same evidence to software.
8.4 Assessing acquired software
Kinds of acquired software
- COTS: typically binaries and documentation. Source access, if any, depends on the agreement. Assurance comes from the vendor’s process evidence, independent assessment, your own testing in a representative environment, and the contract.
- Open source: the source is visible, but upstream support is voluntary unless you contract for it, from a vendor or otherwise. The risks are maintenance, licence terms and supply chain tampering. Indicators include release cadence, response to security reports, active maintainers and sudden ownership changes. In March 2024 CISA reported malicious code “embedded in XZ Utils versions 5.6.0 and 5.6.1” and advised downgrading to an uncompromised version.31 In April 2024 the OpenSSF and OpenJS foundations warned maintainers about “social engineering takeover attempts”.32 OpenSSF Scorecard helps “assess open source projects for risky practices”.33 See Poisoned at the source.
- Third-party: code written for you by contractors, and components embedded in a vendor’s product. You inherit their weaknesses. How much you can see of them depends on the agreement.
- Managed services (the outline’s example is enterprise applications) and cloud services. NIST defines SaaS as the capability “to use the provider’s applications running on a cloud infrastructure”, where the consumer “does not manage or control the underlying cloud infrastructure”.34 FaaS is not one of SP 800-145’s three models. In FaaS you supply functions and the provider runs them on demand, but who patches the runtime depends on packaging. In AWS Lambda, AWS provides updates for its managed runtimes, applied according to the function’s runtime update mode (automatic by default). With a container image, the developer rebuilds from an updated base image and redeploys. With an OS-only runtime, AWS patches that runtime while the developer maintains the language runtime or layer they supply.3536 You keep the code and dependencies you supply, and the function’s permissions and secrets.
SBOM and VEX
An SBOM is the ingredient list. NTIA’s 2021 Minimum Elements defined seven data fields: supplier name, component name, version, other unique identifiers, dependency relationship, author of SBOM data, and timestamp. It set a baseline of machine-readable, automated SBOMs, naming SPDX, CycloneDX and SWID tags as formats in use, and practices such as frequency, depth and known unknowns. It also warned that “SBOM will not solve all software security problems”.37
On 29 July 2026 CISA, NSA, FBI and international partners published 2026 Minimum Elements for a Software Bill of Materials (SBOM), guidance that “updates and replaces” the NTIA document.38 It followed a draft of 22 August 2025. New elements include SBOM Author Signature, SBOM Generation Context, Component Hash Value, Component Hash Algorithm and Component License. SPDX (ISO/IEC 5962:2021) and CycloneDX (ECMA-424) are named as the two widely used formats.39 This is technical guidance. It becomes a requirement only where a contract or policy imposes it.
An SBOM says what its author believes is in the product, not whether a component’s vulnerability matters there. VEX communicates that: CISA calls a VEX document “a form of a security advisory that indicates whether a product or products are affected by a known vulnerability”.40 CISA’s minimum requirements define four statuses (not_affected, affected, fixed, under_investigation). Each statement carries one status for one vulnerability, across “one or more” products, which may be identified by versions or version ranges. A not_affected status needs a justification from a fixed list, including “Component_not_present”, “Vulnerable_code_not_in_execute_path” and “Inline_mitigations_already_exist”, or an impact statement. An affected status must carry an action statement.41 What these documents did and did not achieve in a real incident is the subject of Log4Shell at five.
Worked example 3 (our own): an SBOM entry and a VEX statement
All identifiers are invented. A vendor’s CycloneDX SBOM for its invoicing product lists pkg:maven/org.example/xmlparse@2.3.1 with a SHA-256 hash, included in invoicing-server 5.2. A new advisory, CVE-YYYY-NNNN, affects xmlparse 2.0 to 2.3.4, and the flaw sits in the external entity resolution code.
- Match: your SBOM repository shows xmlparse 2.3.1 in invoicing-server 5.2, which you run.
- Read the VEX: the vendor’s statement lists invoicing-server 5.2.x with
status: not_affected,justification: Vulnerable_code_not_in_execute_path, and an impact statement explaining that the product creates the parser with entity resolution switched off in code, with no setting to turn it on, so the vulnerable routine is never called.41 - Decide: check that the statement’s product scope covers your version and that nothing in your deployment (plug-ins, custom parsers) brings the routine back into use. If both hold, record the decision, link the VEX document to the ticket and lower the priority. Under
under_investigation, apply compensating controls such as blocking XML uploads and follow up; underaffected, follow the action statement through change management. - Revisit: when you upgrade, check whether the statement’s scope extends to the new version before asking the vendor for another.
Neither proves the vendor’s claim; contracts, audits and your own tests add partial assurance.
Contracts, attestation, SOC reports and escrow
A buyer relies on three kinds of evidence. The first is the supplier’s own statements: SSDF-aligned attestation, an SBOM and VEX on request, a vulnerability disclosure policy, and committed patch timelines. The second is independent assurance. A SOC 2 Type 2 report is one source; AICPA’s illustrative example contains management’s assertion, the system description, the service auditor’s report and the tests of controls and their results.42 Read its scope, period, exceptions and the controls the customer must operate itself. How to read one is in CISSP Domain 6. The third is contract terms: security requirements, testing and audit rights, breach notification time, data location, return at exit, and support life. SP 800-53 SA-22 tells organisations to “Replace system components when support for the components is no longer available” or arrange other support.22 See also CISSP Domain 1.
Source code escrow protects the customer of custom or niche software if the supplier fails. A third-party agent holds the source and releases it when the conditions in the agreement are met. The Virginia IT Agency’s guidance lists triggers including a supplier that “ceases to do business or enters bankruptcy proceedings”, tells buyers to check that the deposit “includes source code and not object code”, and has the escrow agent verify deposits “to validate the completeness, accuracy and functionality”. It says escrow “does not apply to off-the-shelf, packaged software purchases”.43 That is one procurement office’s view.
Worked example 4 (our own): buying a SaaS product
A finance team wants a SaaS expense tool that will hold card data and staff bank details. The security manager’s questions, in order:
- What data goes in, at what classification, stored in which jurisdictions.
- Independent assurance: a current SOC 2 Type 2 report whose scope includes the service being bought, with its exceptions, subservice organisations and complementary user entity controls; relevant certifications.
- Development practice: alignment with the SSDF, testing evidence, the vulnerability disclosure policy, patch commitments, and whether an SBOM is available. For federal agencies that choose an SBOM contract term for a cloud platform, M-26-05 says to specify an SBOM “of the runtime production environment”.16
- Identity and access: SSO, MFA, exportable audit logs.
- Contract: breach notification time, testing and audit rights, data return and deletion at exit, notice periods and transition help, liability.
- Your own test of the configuration before go-live.
Escrow rarely fits SaaS; continuity needs notice periods and transition assistance.
8.5 Secure coding guidelines and standards
Source-level weaknesses
CWE names weakness types and CVE names instances; see CVE, CWE and CAPEC. The latest MITRE list is the 2025 CWE Top 25, announced on 11 December 2025 (ranking page updated 15 December) and built from 39,080 CVE Records published between 1 June 2024 and 1 June 2025.4445 Its top five are cross-site scripting (CWE-79), SQL injection (CWE-89), cross-site request forgery (CWE-352), missing authorization (CWE-862) and out-of-bounds write (CWE-787). Use after free, out-of-bounds read and the classic buffer overflow are also listed. Several memory-safety weaknesses therefore rank highly on MITRE’s measure, which combines how often a CWE is the root cause in the mapped CVE Records with their average CVSS severity.46 Whether changing language reduces them is a separate question of evidence. Rank 24 is CWE-639, “Authorization Bypass Through User-Controlled Key”.44 MITRE notes that BOLA “appears to have some overlap” with CWE-639 but “may be applicable to other weaknesses”.47
The OWASP Top 10:2025 groups web application weaknesses into ten risk categories: A01 Broken Access Control, A02 Security Misconfiguration, A03 Software Supply Chain Failures, A04 Cryptographic Failures, A05 Injection, A06 Insecure Design, A07 Authentication Failures, A08 Software or Data Integrity Failures, A09 Security Logging and Alerting Failures, A10 Mishandling of Exceptional Conditions.48
OWASP says the 2025 edition has “two new categories and one consolidation”. Server-side request forgery “has been rolled into” A01, and A10 is new.49 The Top 10 is an awareness document. To verify an application, use the ASVS. Version 5.0.0 was published on 30 May 2025.50 It has 17 chapters, from V1 Encoding and Sanitization through V8 Authorization and V15 Secure Coding and Architecture to V17 WebRTC.51 It has three levels. Level 1 holds “around 20%” of the requirements and is the critical starting point. Most applications “should be striving” for Level 2, which means meeting around 70% (all L1 and L2 requirements). Level 3, the final ~30%, is for applications that must show the highest level of security.52 Because its requirements are verifiable and come in levels, the ASVS suits acceptance criteria in a development contract.
API security
The OWASP API Security Top 10 (2023) lists API1 Broken Object Level Authorization first, with object property and function level authorisation at API3 and API5.53 Against BOLA, OWASP advises an authorisation mechanism “that relies on the user policies and hierarchy”, used “to check if the logged-in user has access to perform the requested action on the record in every function that uses an input from the client to access a record in the database”. It also prefers random, unpredictable record IDs.54 Unpredictable IDs are only defence in depth. The control is the check that the caller is authorised for the requested action on that specific object, whether the action is a read, an update, a delete or a bulk export. ASVS 5.0 requirement 8.2.2, at Level 1, asks that data-specific access be “restricted to consumers with explicit permissions to specific data items to mitigate insecure direct object reference (IDOR) and broken object level authorization (BOLA)”.55
Secure coding practices
The SSDF asks teams to follow secure coding practices suited to their languages (PW.5) and to configure compilers, interpreters and build processes to improve executable security (PW.6).13 OWASP’s Top 10 prevention guidance covers the familiar practices.48 Use a safe, parameterised interface for interpreters (A05). Deny access by default and check it on the server for every request (A01). Handle errors without failing open (A10). Keep secrets out of code, as covered under 8.2. Least functionality applies to code as well as servers: SP 800-53 CM-7 says to “provide only” the capabilities the mission needs,22 so remove debug endpoints, sample code and unused features before release. The 2024 outline’s last 8.5 bullet, software-defined security, means enforcing security policy through programmable infrastructure such as policy-as-code. From April 2027 it belongs to Domain 4.
Worked example 5 (our own): fixing an injection flaw and a BOLA flaw
Injection. An order search builds SQL by concatenation: query = "SELECT * FROM orders WHERE customer = '" + name + "'". Input such as x' OR '1'='1 changes the structure of the query. The fix keeps data values out of the structure: query = "SELECT * FROM orders WHERE customer = ?" with db.execute(query, [name]), or an ORM call that binds parameters. OWASP calls a “safe API, which avoids using the interpreter entirely, provides a parameterized interface” the preferred option. It warns that stored procedures can still be injectable if they concatenate internally.56 Binding covers data values. Identifiers such as sort columns cannot be bound, so they need an allow-list.
BOLA. A handler for GET /api/orders/{id} runs order = Orders.findById(id) and returns the order to any authenticated caller. A user who changes 1041 to 1042 reads someone else’s order. In this toy system the policy is ownership, so the fix binds the lookup to the caller: order = Orders.findByIdAndOwner(id, session.userId). A miss returns 404, which does not confirm the record exists. OWASP’s A01 states that access controls “should enforce record ownership rather than allowing users to create, read, update, or delete any record”.57 The check belongs in a shared function called by every handler that reads, changes or deletes an object, with a test that one user’s token cannot touch another’s objects.
In both cases the coding standard, a shared library and a regression test help catch the flaw if it recurs. Review is still needed for query and authorisation paths that the tests do not reach.
Practice questions
Twenty-two scenarios written for this article, keyed to the public objectives and not drawn from any live or published item. Objective numbers are the same in both outlines unless noted.
Question 1
A software company sells to several government agencies, and one asks for evidence that its development practices follow a recognised secure development framework. What should the company’s security manager provide FIRST?
- A. The latest penetration test report for the product
- B. A mapping of the company’s development practices to the NIST SSDF practices, with evidence for each
- C. A completed industry security questionnaire about the company’s hosting environment
- D. The company’s latest SOC 2 Type 2 report
Answer: B. An evidenced SSDF mapping answers the question asked directly; the SSDF is a common vocabulary between producers and acquirers.11 A samples only the scope and version tested. C covers hosting. D can include development or change controls if in scope, but it is not a mapping to a development framework. Objective 8.1 (named explicitly in 2027 8.1).
Question 2
A vendor’s SBOM shows that its product contains a library affected by a newly announced critical vulnerability. The vendor has published a VEX statement marking the product “not_affected” with the justification “Vulnerable_code_not_in_execute_path”. What should the customer’s security manager do?
- A. Remove the product immediately, because the SBOM proves it is vulnerable
- B. Close the ticket permanently, because the vendor has ruled the vulnerability out
- C. Record the VEX statement against the ticket, confirm that it covers the version in use and that local configuration does not invalidate it, and revisit if either changes
- D. Ask the vendor to remove the library from the SBOM
Answer: C. A VEX statement gives the author’s status for a stated product scope, so the customer checks scope and configuration and documents the decision.41 A treats presence as exploitability. B treats a scoped claim as permanent. D asks for a less accurate SBOM. Objective 8.4 (2027 8.1 also names SBOM requirements).
Question 3
A development director wants to reduce the security rework caused by defects in a product released monthly. Which action BEST reflects a shift-left approach?
- A. Add threat modelling to design and static analysis to every pull request
- B. Commission an annual third-party penetration test of the production system
- C. Increase the bug bounty payout for the live service
- D. Add a web application firewall in front of production
Answer: A. Shift left moves detection to design and code, before a flaw ships. B, C and D act on flaws that have already shipped. Objective 8.1 (2027 bullet “Shift left”).
Question 4
A team has run SAST on its application source on every commit for a year. A penetration test then finds that the production web server returns verbose stack traces and accepts outdated TLS versions, both set in the server’s deployment configuration. Why did SAST miss these?
- A. The SAST tool was misconfigured
- B. SAST cannot analyse code written in object-oriented languages
- C. The penetration testers used a different CWE taxonomy
- D. The issues lie in the deployed server’s effective configuration, outside the scanned source, which DAST observes
Answer: D. SAST examines what it is given, and these settings were not in the scanned code. DAST sees the effective runtime configuration. A does not explain this gap. B is false. C is irrelevant. Objective 8.2.
Question 5
A team discovers that a third of its production services use a logging library version with a known exploited vulnerability. Nobody knew the library was there, because it came in as a dependency of a dependency. Which control would MOST directly have prevented this?
- A. Mandatory secure coding training
- B. Software composition analysis of each build’s resolved dependency graph, with a policy gate on known exploited vulnerabilities
- C. Code review of every pull request
- D. Annual DAST of each service
Answer: B. SCA over the resolved graph identifies transitive components and matches them to known vulnerabilities.30 A and C focus on the team’s own code. D might find symptoms, but it does not inventory components. Objective 8.2 (2027: SCA is an example under 8.4, open source).
Question 6
At a fintech, developers can edit the CI/CD pipeline definitions in the same repository as their code and merge their own changes. What is the BEST control to put in place?
- A. Add more security scanners to the pipeline
- B. Require developers to sign a code of conduct
- C. Put pipeline definitions under separate ownership, require independent approval on the protected release branch, enforce that requirement for administrators and roles with bypass permission, and reserve rule changes for a separate role
- D. Move the pipeline to a different cloud provider
Answer: C. Whoever controls the pipeline controls what reaches production, so separation of duties applies to it, through required independent review that privileged roles cannot bypass.2228 A adds checks the same developer could disable. B is administrative and weak. D changes nothing about who has access. Objective 8.2.
Question 7
During an outage, an engineer applies an urgent database configuration change in production under the organisation’s emergency change procedure, with verbal approval from the on-call manager. The outage ends. What should happen NEXT?
- A. Record the change and have the change board review it as soon as practical, then confirm, adjust or roll it back
- B. Reverse the change at once because it did not go through the full board
- C. Discipline the engineer for bypassing change control
- D. Nothing further, because the change fixed the problem
Answer: A. NIST’s guide says unscheduled changes are “reviewed/resolved by the CCB as soon as is practical after” they are made.23 B could restart the outage. C ignores the fact that the emergency procedure was followed. D leaves an unreviewed change in the baseline. Objective 8.1.
Question 8
A CISO wants to know where the organisation’s software security programme stands across all teams and which improvements to fund over the next two years. Which is the BEST tool?
- A. A check of the flagship application against the OWASP Top 10
- B. The trend in open SAST findings over the past year
- C. A penetration test of every customer-facing application
- D. An OWASP SAMM assessment
Answer: D. SAMM assesses practices across five business functions and supports an improvement roadmap.1920 A covers one application against a list of risks. B measures code findings, which tool changes can distort. C tests products, not the programme that builds them. Objective 8.1.
Question 9
A hospital plans to buy a COTS laboratory system. The vendor will not share source code. What is the BEST way to gain assurance before purchase?
- A. Reverse engineer the binaries
- B. Combine evidence of the vendor’s development process, testing of the delivered product in a representative environment, and contractual security commitments
- C. Rely on the vendor’s ISO/IEC 27001 certificate
- D. Make source code access a condition of purchase
Answer: B. Assurance for COTS combines three kinds of evidence: how the supplier builds, what the delivered product does, and what the supplier is committed to provide. A may breach the licence and is costly. C certifies a management system, whose scope may not cover product development. D contradicts the vendor’s stated position and is not the only route to assurance. Objective 8.4.
Question 10
A product team wants to adopt an open-source parsing library for its main data path. The library has one listed maintainer, no release for two years and several unanswered security reports. What should the security manager consider MOST important?
- A. Whether the library has many stars on its hosting site
- B. Whether the library is written in the same language as the product
- C. Maintenance and supply chain risk, including who will patch it and how releases are verified
- D. Whether the licence allows commercial use, and nothing else
Answer: C. One SSDF implementation example under PW.4.4 is to ensure each component “is still actively maintained”, and unanswered security reports suggest that nobody is patching it.13 A is a popularity signal. B is a preference. D is only one risk. Objective 8.4.
Question 11
A business unit wants to adopt a SaaS customer-relationship tool within a month. The provider’s terms do not permit customers to test its shared infrastructure. Which should the security manager request FIRST?
- A. A current independent assurance report, such as a SOC 2 Type 2, whose scope covers the services to be used
- B. The provider’s source code
- C. Permission to run a penetration test of the provider’s shared infrastructure
- D. A source code escrow agreement
Answer: A. Under these terms, a scoped independent report is the best of the listed options, because the customer controls little of the stack. B and D suit installed custom software. C is excluded by the terms. Objective 8.4.
Question 12
A mobile banking API returns account statements at /api/statements/{id}. Testers find that any authenticated user can read any statement by changing the ID. What is the BEST fix?
- A. Replace sequential IDs with random identifiers
- B. Add rate limiting to the endpoint
- C. Encrypt the statement ID in the URL
- D. Check on the server, for every request, that the caller is authorised to access that specific statement
Answer: D. This is broken object level authorisation. The fix is an object-level authorisation check in every function that takes a client-supplied ID.54 A and C make guessing harder but leave the flaw. B slows enumeration without stopping it. Objective 8.5.
Question 13
A code review finds a search function that builds SQL statements by concatenating user input. What should the development manager require?
- A. A web application firewall rule for SQL keywords
- B. Parameterised queries or a safe API, written into the secure coding standard and backed by SAST and regression tests
- C. Escaping of single quotes in the input
- D. Restricting the search to logged-in users
Answer: B. Parameter binding keeps data values out of the query structure.56 The standard and the pipeline help catch recurrences, and review still covers parts that cannot be bound, such as column names. A and C are partial measures that can be bypassed. D reduces exposure without removing the flaw. Objective 8.5.
Question 14
A device manufacturer’s vulnerability history is dominated by buffer overflows and use-after-free defects in its C firmware. Which long-term strategy BEST addresses this class of vulnerability?
- A. Doubling the number of manual code reviewers
- B. Adding a network firewall in front of the devices
- C. A published roadmap to write new components in memory-safe languages, limit and review unsafe code, and address memory-unsafe dependencies
- D. Moving to a faster release cycle
Answer: C. CISA and its partners recommend memory-safe roadmaps, which prevent the class in code that stays within the language’s guarantees, together with a plan for dependencies.2425 A, B and D leave the defect class in place. Objective 8.2 (2027 example “memory safe”).
Question 15
Customers download a vendor’s agent installer from its website. The vendor wants customers to be able to confirm that the installer is genuine and unaltered. What should it implement?
- A. Code signing with a protected key, plus guidance for customers on verifying the signature against the vendor’s certificate
- B. Obfuscation of the installer
- C. Hosting the installer only over HTTPS
- D. A licence key check during installation
Answer: A. A verified signature lets the customer check the origin and integrity of the file itself (SSDF PS.2), provided the key is protected.1322 B proves nothing. C protects only the transfer. D controls licensing. Objective 8.2 (integrity also bears on 8.4).
Question 16
A firm depends on bespoke trading software written by a small supplier. The board worries about what happens if the supplier goes out of business. What is the BEST contractual protection?
- A. A larger service credit in the SLA
- B. A clause requiring the supplier to carry cyber insurance
- C. A right-to-audit clause
- D. A source code escrow agreement with defined release conditions and verification of deposits
Answer: D. Escrow releases the source when defined events such as insolvency occur, and its value depends on clear triggers and verified deposits.43 A pays money, not continuity. B protects the supplier. C ends with the supplier. Objective 8.4.
Question 17
A regulator requires full documentation and formal sign-off of the requirements before any design work starts. Which development approach fits this constraint MOST naturally?
- A. Scrum with two-week sprints
- B. Waterfall
- C. Continuous deployment with feature flags
- D. Extreme programming
Answer: B. Waterfall’s sequential gates match a sign-off before design. Iterative approaches can also honour a formal sign-off, but they expect requirements to evolve, as the Agile Manifesto’s “Responding to change over following a plan” makes explicit.5 C is a delivery practice rather than a way of fixing requirements. Objective 8.1.
Question 18
After a production incident, investigators cannot tell who approved a code change that introduced the flaw, because developers can rewrite repository history. What should the security manager do FIRST?
- A. Ban force pushes to all branches
- B. Retrain developers on secure coding
- C. Ensure that approvals, merges and deployments are logged to a store that developers cannot alter
- D. Add a SAST gate to the pipeline
Answer: C. Objective 8.3 lists auditing and logging of changes,1 and AU-9 requires audit information to be protected from unauthorised modification.22 A helps but closes only one path. B and D address code quality, not accountability. Objective 8.3.
Question 19
A SAST scan of a legacy application produces 4,000 findings two weeks before release. The release policy blocks release only for confirmed findings above a set severity. What should the application owner do?
- A. Have the findings validated, fix before release those that meet the blocking threshold, give other confirmed findings owners and remediation dates, and send any proposed risk acceptance to the designated risk authority
- B. Delay the release until every finding is fixed
- C. Turn off the SAST tool because it generates too many false positives
- D. Ask the security team to accept all the findings
Answer: A. Objective 8.3 includes risk analysis and mitigation.1 Validate and triage the findings, then apply the scenario’s release policy to confirmed findings.10 B treats unvalidated alerts as confirmed risk. C removes the evidence. D asks the wrong party; acceptance goes to whoever governance designates. Objective 8.3.
Question 20
A federal agency following the NIST RMF has finished a new claims system, and the acceptance tests against its security requirements have been completed. Who should decide whether the residual risk is acceptable and the system may operate?
- A. The lead developer, who knows the code best
- B. The independent assessor who ran the tests
- C. The change advisory board chair
- D. The authorizing official designated for the system
Answer: D. Under the RMF, explicit risk acceptance belongs to the authorizing official and “cannot be delegated”.8 A has a conflict of interest. B supplies evidence. C approves changes, not authorisation to operate. Objectives 8.1 and 8.3.
Question 21
A product is in its fifth year of operation. Patches are applied by an operations team that was never involved in its design, and security defects keep reappearing after patches. What is the BEST structural change?
- A. Outsource maintenance to a new supplier
- B. Form an integrated product team with development, operations and security represented for the product’s life, with patches going through the same review and testing as new features
- C. Stop patching except for critical vulnerabilities
- D. Add a second operations shift
Answer: B. Maintenance re-enters the life cycle, and an integrated product team keeps design knowledge and security involvement throughout. A, C and D move the problem, raise exposure or add capacity without knowledge. Objective 8.1.
Question 22
A bank needs a verifiable application security standard to write into a development contract for its online banking portal. Which is the BEST choice?
- A. The OWASP Top 10:2025 as the acceptance criteria
- B. The CWE Top 25 as the acceptance criteria
- C. OWASP ASVS 5.0 at Level 3, tailored to the application
- D. The vendor’s internal coding guidelines
Answer: C. The ASVS is a verification standard with levels, and OWASP’s own example says a bank may have difficulty justifying “anything less than Level 3” for online banking.52 A is an awareness document. B is a list of weaknesses, not requirements. D gives the bank no independent standard. Objective 8.5.
Free resources
- ISC2 exam outlines, 2024 and 2027. Use the one for your exam date.31
- ISC2 CISSP flash cards. Free after a short form; Domain 8 is listed.5859
- NIST SP 800-218 (SSDF 1.1) and the 1.2 draft. Practices, tasks and examples.1314
- CISA SBOM page and the 2026 Minimum Elements. SBOM fields, formats and VEX resources.4039
- CISA Minimum Requirements for VEX. Statuses and justifications.41
- OWASP Top 10:2025. Categories with prevention advice.48
- OWASP ASVS 5.0.0. Verifiable requirements by chapter and level.50
- OWASP API Security Top 10 (2023). API risks with attack scenarios.53
- OWASP SAMM. The model and its assessment toolbox.1920
- MITRE 2025 CWE Top 25. Ranked weaknesses.44
- CISA Secure by Design and memory-safety guidance. Pledge goals and memory-safe roadmaps.6024
Conclusion
Domain 8 comes down to who acts on what evidence. Requirements set the tests. Each technique runs where it can see the flaw: language choice and threat modelling at design, SAST and SCA in the pipeline, DAST and fuzzing against running builds. Change records and protected logs show who changed what. Validated findings go to an owner with a date, and risk is accepted by the official who holds that authority. For acquired software, the evidence covers how the supplier builds, what the delivered product does, and what the contract commits the supplier to. SBOM and VEX, SOC reports, escrow and acceptance tests each answer part of that question, and none of them answers all of it.
Footnotes
- ISC2, CISSP Certification Exam Outline, effective 15 April 2027 (English PDF, footer 09/26): CAT information and average weights (p. 3), 1.11 (p. 5), 4.1 (p. 9), 7.2 (p. 12), Domain 8 (p. 14). https://edge.sitecorecloud.io/internationf173-xmc4e73-prodbc0f-9660/media/Project/ISC2/Main/Media/documents/exam-outlines/2027/EXAMS-CISSP-Exam-Outline-English-RB-Revised-1016-ENU-2.pdf (opens in a new tab) ↩1 ↩2 ↩3 ↩4 ↩5 ↩6 ↩7 ↩8
- ISC2, “2027 CISSP Exam Outline Update: What Candidates and CISSP Holders Need to Know”, ISC2 Insights, 24 November 2026. https://www.isc2.org/insights/2026/11/cissp-exam-outline-update (opens in a new tab) ↩1 ↩2
- ISC2, CISSP Certification Exam Outline, effective 15 April 2024 (English PDF): average weights (p. 3), 1.11 (p. 5), Domain 8 (p. 14). https://edge.sitecorecloud.io/internationf173-xmc4e73-prodbc0f-9660/media/Project/ISC2/Main/Media/documents/exam-outlines/CISSP-Exam-Outline-April-2024-English.pdf (opens in a new tab) ↩1 ↩2 ↩3 ↩4
- ISC2, CISSP Exam Outline web page (AI section). https://www.isc2.org/certifications/cissp/cissp-exam-outline (opens in a new tab) ↩
- Beck, K. et al., Manifesto for Agile Software Development, 2001. https://agilemanifesto.org/ (opens in a new tab) ↩1 ↩2
- Principles behind the Agile Manifesto, 2001. https://agilemanifesto.org/principles.html (opens in a new tab) ↩
- Scaled Agile, Inc., SAFe Framework site. https://framework.scaledagile.com/ (opens in a new tab) ↩
- NIST, SP 800-37 Rev. 2, Risk Management Framework for Information Systems and Organizations, December 2018: Task R-4 discussion. https://nvlpubs.nist.gov/nistpubs/SpecialPublications/NIST.SP.800-37r2.pdf (opens in a new tab) ↩1 ↩2
- Menzies, T., Nichols, W., Shull, F. and Layman, L., “Are Delayed Issues Harder to Resolve? Revisiting Cost-to-Fix of Defects throughout the Lifecycle”, arXiv:1609.04886, 16 September 2016. https://arxiv.org/abs/1609.04886 (opens in a new tab) ↩
- OWASP Developer Guide, Static Analysis (benefits and limitations). https://devguide.owasp.org/en/05-implementation/05-static-analysis/ (opens in a new tab) ↩1 ↩2 ↩3
- NIST, SP 800-218, SSDF Version 1.1, final publication record (February 2022; supersedes CSWP 13). https://csrc.nist.gov/pubs/sp/800/218/final (opens in a new tab) ↩1 ↩2 ↩3 ↩4
- NIST, Secure Software Development Framework project page (practice groups; updated 6 October 2026). https://csrc.nist.gov/projects/ssdf (opens in a new tab) ↩
- Souppaya, M., Scarfone, K. and Dodson, D., NIST SP 800-218, SSDF Version 1.1, February 2022 (PDF): Table 1 practices and tasks; PW.3 relocation notes. https://nvlpubs.nist.gov/nistpubs/SpecialPublications/NIST.SP.800-218.pdf (opens in a new tab) ↩1 ↩2 ↩3 ↩4 ↩5 ↩6 ↩7 ↩8 ↩9 ↩10
- NIST, SP 800-218 Rev. 1 (Initial Public Draft), SSDF Version 1.2, 17 December 2025; comments due 30 January 2026; issued per Executive Order 14306. https://csrc.nist.gov/pubs/sp/800/218/r1/ipd (opens in a new tab) ↩1 ↩2
- Booth, H. et al., NIST SP 800-218r1 ipd, SSDF Version 1.2 (draft PDF), December 2025: PO.6, PS.4 and Appendix B change log. https://nvlpubs.nist.gov/nistpubs/SpecialPublications/NIST.SP.800-218r1.ipd.pdf (opens in a new tab) ↩
- Office of Management and Budget, Memorandum M-26-05, “Adopting a Risk-based Approach to Software and Hardware Security”, 23 January 2026 (including footnote 1). https://www.whitehouse.gov/wp-content/uploads/2026/01/M-26-05-Adopting-a-Risk-based-Approach-to-Software-and-Hardware-Security.pdf (opens in a new tab) ↩1 ↩2
- Paulk, M., Curtis, W., Chrissis, M. B. and Weber, C., Capability Maturity Model for Software, Version 1.1, CMU/SEI-93-TR-024, SEI, February 1993. https://insights.sei.cmu.edu/library/capability-maturity-model-for-software-version-11/ (opens in a new tab) ↩
- CMMI Institute (ISACA), CMMI Levels of Capability and Performance. https://cmmiinstitute.com/learning/appraisals/levels (opens in a new tab) ↩
- OWASP, Software Assurance Maturity Model (SAMM) v2, the model page. https://owaspsamm.org/model/ (opens in a new tab) ↩1 ↩2 ↩3
- OWASP SAMM, SAMM Assessment (assessment toolbox). https://owaspsamm.org/assessment/ (opens in a new tab) ↩1 ↩2 ↩3
- Black Duck, BSIMM16 Report page (publisher’s own statement, January 2026). https://www.blackduck.com/resources/analyst-reports/bsimm.html (opens in a new tab) ↩
- NIST, SP 800-53 Rev. 5, Security and Privacy Controls for Information Systems and Organizations, September 2020: AC-5, AU-9, CM-3 and CM-3(4), CM-5 and CM-5(4), CM-7, CM-14, SA-10, SA-11(1), (8) and (9), SA-22. https://nvlpubs.nist.gov/nistpubs/SpecialPublications/NIST.SP.800-53r5.pdf (opens in a new tab) ↩1 ↩2 ↩3 ↩4 ↩5 ↩6 ↩7 ↩8 ↩9 ↩10 ↩11 ↩12
- Johnson, A. et al., NIST SP 800-128, Guide for Security-Focused Configuration Management of Information Systems, August 2011 (with updates): section 3.3.2, configuration change control steps and unscheduled changes. https://nvlpubs.nist.gov/nistpubs/SpecialPublications/NIST.SP.800-128.pdf (opens in a new tab) ↩1 ↩2
- CISA, “The Case for Memory Safe Roadmaps”, resource page, published 6 December 2023. https://www.cisa.gov/resources-tools/resources/case-memory-safe-roadmaps (opens in a new tab) ↩1 ↩2 ↩3
- CISA, NSA, FBI et al., The Case for Memory Safe Roadmaps: Why Both C-Suite Executives and Technical Experts Need to Take Memory Safe Coding Seriously, December 2023 (PDF). https://www.cisa.gov/sites/default/files/2023-12/The-Case-for-Memory-Safe-Roadmaps-508c.pdf (opens in a new tab) ↩1 ↩2
- CISA and NSA, “Memory Safe Languages: Reducing Vulnerabilities in Modern Software Development”, resource page, 24 June 2025. https://www.cisa.gov/resources-tools/resources/memory-safe-languages-reducing-vulnerabilities-modern-software-development (opens in a new tab) ↩
- CISA, “CISA and NSA Release Joint Guidance on Defending Continuous Integration/Continuous Delivery (CI/CD) Environments”, 28 June 2023. https://www.cisa.gov/news-events/alerts/2023/06/28/cisa-and-nsa-release-joint-guidance-defending-continuous-integrationcontinuous-delivery-cicd (opens in a new tab) ↩
- GitHub Docs, “About protected branches”. https://docs.github.com/en/repositories/configuring-branches-and-merges-in-your-repository/managing-protected-branches/about-protected-branches (opens in a new tab) ↩1 ↩2
- Black, P., Guttman, B. and Okun, V., NISTIR 8397, Guidelines on Minimum Standards for Developer Verification of Software, October 2021: sections 2.2, 2.4 and 2.9. https://nvlpubs.nist.gov/nistpubs/ir/2021/NIST.IR.8397.pdf (opens in a new tab) ↩1 ↩2
- OWASP Cheat Sheet Series, Software Supply Chain Security Cheat Sheet. https://cheatsheetseries.owasp.org/cheatsheets/Software_Supply_Chain_Security_Cheat_Sheet.html (opens in a new tab) ↩1 ↩2
- CISA, “Reported Supply Chain Compromise Affecting XZ Utils Data Compression Library, CVE-2024-3094”, 29 March 2024. https://www.cisa.gov/news-events/alerts/2024/03/29/reported-supply-chain-compromise-affecting-xz-utils-data-compression-library-cve-2024-3094 (opens in a new tab) ↩
- OpenSSF, “Open Source Security (OpenSSF) and OpenJS Foundations Issue Alert for Social Engineering Takeovers of Open Source Projects”, 15 April 2024. https://openssf.org/blog/2024/04/15/open-source-security-openssf-and-openjs-foundations-issue-alert-for-social-engineering-takeovers-of-open-source-projects/ (opens in a new tab) ↩
- Open Source Security Foundation, OpenSSF Scorecard. https://scorecard.dev/ (opens in a new tab) ↩
- Mell, P. and Grance, T., NIST SP 800-145, The NIST Definition of Cloud Computing, September 2011. https://nvlpubs.nist.gov/nistpubs/Legacy/SP/nistspecialpublication800-145.pdf (opens in a new tab) ↩
- AWS, AWS Lambda Developer Guide, “Customer-managed runtimes” (responsibility table). https://docs.aws.amazon.com/lambda/latest/dg/runtimes-customer-managed.html (opens in a new tab) ↩
- AWS, AWS Lambda Developer Guide, “Runtime update modes”. https://docs.aws.amazon.com/lambda/latest/dg/runtimes-update.html (opens in a new tab) ↩
- NTIA, The Minimum Elements For a Software Bill of Materials (SBOM), 12 July 2021. https://www.ntia.gov/files/ntia/publications/sbom_minimum_elements_report.pdf (opens in a new tab) ↩
- CISA, “2026 Minimum Elements for a Software Bill of Materials (SBOM)”, publication page, 29 July 2026. https://www.cisa.gov/resources-tools/resources/2026-minimum-elements-software-bill-materials-sbom (opens in a new tab) ↩
- CISA, NSA, FBI and partners, 2026 Minimum Elements for a Software Bill of Materials (SBOM), version 2.1, 29 July 2026 (PDF). https://www.cisa.gov/sites/default/files/2026-07/2026_cisa_sbom_minimum_elements_508c.pdf (opens in a new tab) ↩1 ↩2
- CISA, Software Bill of Materials (SBOM) topic page. https://www.cisa.gov/sbom (opens in a new tab) ↩1 ↩2
- CISA, Minimum Requirements for Vulnerability Exploitability eXchange (VEX), April 2023: sections 2.3 to 2.7. https://www.cisa.gov/sites/default/files/2023-04/minimum-requirements-for-vex-508c.pdf (opens in a new tab) ↩1 ↩2 ↩3 ↩4
- AICPA & CIMA, Illustrative SOC 2 Report with Illustrative System Description (Type 2), 30 September 2023, resource page. https://www.aicpa-cima.com/resources/download/illustrative-soc-2-r-report-with-description-and-assertion (opens in a new tab) ↩
- Virginia IT Agency (VITA), Guidance on Source Code Escrow and Escrow Agreements, file dated 27 February 2025. https://vita.am.virginia.gov/media/vitavirginiagov/supply-chain/pdf/Guidance-on-Source-Code-Escrow-2025-02-27.pdf (opens in a new tab) ↩1 ↩2
- MITRE, 2025 CWE Top 25 Most Dangerous Software Weaknesses, page last updated 15 December 2025. https://cwe.mitre.org/top25/archive/2025/2025_cwe_top25.html (opens in a new tab) ↩1 ↩2 ↩3
- MITRE, 2025 CWE Top 25 Methodology. https://cwe.mitre.org/top25/archive/2025/2025_methodology.html (opens in a new tab) ↩
- MITRE, “2025 ‘CWE Top 25’ Now Available!”, CWE news, 11 December 2025. https://cwe.mitre.org/news/archives/news2025.html (opens in a new tab) ↩
- MITRE, CWE-639: Authorization Bypass Through User-Controlled Key (alternate terms). https://cwe.mitre.org/data/definitions/639.html (opens in a new tab) ↩
- OWASP, OWASP Top 10:2025. https://top10.owasp.org/2025/ (opens in a new tab) ↩1 ↩2 ↩3
- OWASP, OWASP Top 10:2025, Introduction. https://top10.owasp.org/2025/0x00_2025-Introduction/ (opens in a new tab) ↩
- OWASP, Application Security Verification Standard (ASVS 5.0.0, published 30 May 2025), project site. https://asvs.owasp.org/ (opens in a new tab) ↩1 ↩2
- OWASP, ASVS 5.0.0 English source files (chapter list), GitHub, tag v5.0.0. https://github.com/OWASP/ASVS/tree/v5.0.0/5.0/en (opens in a new tab) ↩
- OWASP, ASVS 5.0.0, “What is the ASVS?” (verification levels). https://github.com/OWASP/ASVS/blob/v5.0.0/5.0/en/0x03-What-is-the-ASVS.md (opens in a new tab) ↩1 ↩2
- OWASP, API Security Top 10 2023. https://owasp.org/API-Security/editions/2023/en/0x11-t10/ (opens in a new tab) ↩1 ↩2
- OWASP, API1:2023 Broken Object Level Authorization. https://owasp.org/API-Security/editions/2023/en/0xa1-broken-object-level-authorization/ (opens in a new tab) ↩1 ↩2
- OWASP, ASVS 5.0.0, V8 Authorization. https://github.com/OWASP/ASVS/blob/v5.0.0/5.0/en/0x17-V8-Authorization.md (opens in a new tab) ↩
- OWASP, A05:2025 Injection. https://top10.owasp.org/2025/A05_2025-Injection/ (opens in a new tab) ↩1 ↩2
- OWASP, A01:2025 Broken Access Control. https://top10.owasp.org/2025/A01_2025-Broken_Access_Control/ (opens in a new tab) ↩
- ISC2, CISSP Self-Study Resources. https://www.isc2.org/certifications/cissp/cissp-self-study-resources (opens in a new tab) ↩
- ISC2, CISSP Flash Cards (free with registration form). https://cloud.connect.isc2.org/cissp-flashcards (opens in a new tab) ↩
- CISA, Secure by Design. https://www.cisa.gov/securebydesign (opens in a new tab) ↩

SecSIG